IAC logo
IAC Assessment: UD0468
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0468
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1995
Principal Product clutch assemblies, power steering pumps, rear differentials
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 439,000
Annual Production 110,000 Pieces
Production Hrs. Annual 8,200
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $383,319 7,214,830 kWh $0.05
Natural Gas $45,650 8,372 MMBtu $5.45
TOTAL ENERGY COSTS $428,969
RECOMMENDED SAVINGS* $32,948 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,512
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,436
Cost:
$10,000
$5,436 - - - - - $5,436
-
kWh
-
-
MMBtu
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$10,000
Cost:
$25,000
- - - - $10,000 - -
-
kWh
-
-
MMBtu
$10,000
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,738
Cost:
$1,000
$2,709 53,341 $(-355) (-71) $384 - $2,709
53,341
kWh
$(-355)
(-71)
MMBtu
$384
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,406
Cost:
$30,850
$11,406 197,538 - - - - $11,406
197,538
kWh
-
-
MMBtu
-
-
$
05: 2.7122 DISCONNECT BALLASTS Savings:
$3,368
Cost:
$3,000
$3,572 70,926 $(-470) (-94) $266 - $3,572
70,926
kWh
$(-470)
(-94)
MMBtu
$266
-
$
TOTAL RECOMMENDED Savings:
$32,948
Cost:
$69,850
$23,123 321,805 $(-825) (-165) $10,650 - $23,123
321,805
kWh
$(-825)
(-165)
MMBtu
$10,650
-
$
TOTAL IMPLEMENTED Savings:
$17,512
Cost:
$34,850
$17,687 321,805 $(-825) (-165) $650 - $17,687
321,805
kWh
$(-825)
(-165)
MMBtu
$650
-
$