Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1995 |
Principal Product | power steering pumps, marine tilt motors |
NAICS | n/a |
SIC | 3914 - Silverware And Plated Ware |
Sales | $50,000,000-$100,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 208,000 |
Annual Production | 1,300,000 Pieces |
Production Hrs. Annual | 8,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $487,378 | 9,672,040 | kWh | $0.05 |
Natural Gas | $71,970 | 15,584 | MMBtu | $4.62 |
TOTAL ENERGY COSTS | $559,348 | |||
RECOMMENDED SAVINGS* | $145,691 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $145,691 |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Other Liquid (non-haz) | Administrative Changes | Primary Raw Material | Electricity Usage | Water Disposal | Other Liquid (non-haz) | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS |
Savings: $46,950 Cost: $180,000 |
$51,030 | - | - | - | - | - | $(-4,080) | - | - | - |
$51,030 - kWh |
- - Tgal |
- - gal |
$(-4,080) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $26,000 Cost: $50,000 |
- | - | - | - | - | - | $26,000 | - | - | - |
- - kWh |
- - Tgal |
- - gal |
$26,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $4,642 Cost: $600 |
$4,080 | 192,556 | - | - | - | - | - | - | $562 | - |
$4,080 192,556 kWh |
- - Tgal |
- - gal |
- - $ |
$562 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $12,786 Cost: $3,320 |
$11,666 | 275,791 | - | - | - | - | $1,120 | - | - | - |
$11,666 275,791 kWh |
- - Tgal |
- - gal |
$1,120 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $1,313 Cost: $200 |
- | - | $1,313 | 2,977 | - | - | - | - | - | - |
- - kWh |
$1,313 2,977 Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID |
Savings: $54,000 Cost: $7,500 |
- | - | - | - | $54,000 | 270,000 | - | - | - | - |
- - kWh |
- - Tgal |
$54,000 270,000 gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $145,691 Cost: $241,620 |
$66,776 | 468,347 | $1,313 | 2,977 | $54,000 | 270,000 | $23,040 | - | $562 | - | $66,776 468,347 kWh |
$1,313 2,977 Tgal |
$54,000 270,000 gal |
$23,040 - $ |
$562 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $145,691 Cost: $241,620 |
$66,776 | 468,347 | $1,313 | 2,977 | $54,000 | 270,000 | $23,040 | - | $562 | - | $66,776 468,347 kWh |
$1,313 2,977 Tgal |
$54,000 270,000 gal |
$23,040 - $ |
$562 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Other Liquid (non-haz) | Administrative Changes | Primary Raw Material | Electricity Usage | Water Disposal | Other Liquid (non-haz) | Administrative Changes | Primary Raw Material |