IAC Assessment: UD0471
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0471
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1995
Principal Product power steering pumps, marine tilt motors
NAICS n/a
SIC 3914 - Silverware And Plated Ware
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 208,000
Annual Production 1,300,000 Pieces
Production Hrs. Annual 8,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $487,378 9,672,040 kWh $0.05
Natural Gas $71,970 15,584 MMBtu $4.62
TOTAL ENERGY COSTS $559,348
RECOMMENDED SAVINGS* $145,691 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $145,691
#|Description Savings
Cost
Status Electricity Usage Water Disposal Other Liquid (non-haz) Administrative Changes Primary Raw Material Electricity Usage Water Disposal Other Liquid (non-haz) Administrative Changes Primary Raw Material
$ kWh $ Tgal $ gal $ $ $ $
01: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$46,950
Cost:
$180,000
$51,030 - - - - - $(-4,080) - - - $51,030
-
kWh
-
-
Tgal
-
-
gal
$(-4,080)
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$26,000
Cost:
$50,000
- - - - - - $26,000 - - - -
-
kWh
-
-
Tgal
-
-
gal
$26,000
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,642
Cost:
$600
$4,080 192,556 - - - - - - $562 - $4,080
192,556
kWh
-
-
Tgal
-
-
gal
-
-
$
$562
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,786
Cost:
$3,320
$11,666 275,791 - - - - $1,120 - - - $11,666
275,791
kWh
-
-
Tgal
-
-
gal
$1,120
-
$
-
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,313
Cost:
$200
- - $1,313 2,977 - - - - - - -
-
kWh
$1,313
2,977
Tgal
-
-
gal
-
-
$
-
-
$
06: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$54,000
Cost:
$7,500
- - - - $54,000 270,000 - - - - -
-
kWh
-
-
Tgal
$54,000
270,000
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$145,691
Cost:
$241,620
$66,776 468,347 $1,313 2,977 $54,000 270,000 $23,040 - $562 - $66,776
468,347
kWh
$1,313
2,977
Tgal
$54,000
270,000
gal
$23,040
-
$
$562
-
$
TOTAL IMPLEMENTED Savings:
$145,691
Cost:
$241,620
$66,776 468,347 $1,313 2,977 $54,000 270,000 $23,040 - $562 - $66,776
468,347
kWh
$1,313
2,977
Tgal
$54,000
270,000
gal
$23,040
-
$
$562
-
$
Savings
Cost
$ kWh $ Tgal $ gal $ $ $ $
Electricity Usage Water Disposal Other Liquid (non-haz) Administrative Changes Primary Raw Material Electricity Usage Water Disposal Other Liquid (non-haz) Administrative Changes Primary Raw Material