Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1995 |
Principal Product | non-clay brick, special shaped refractories |
NAICS | n/a |
SIC | 3297 - Nonclay Refractories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 60,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $314,591 | 5,524,619 | kWh | $0.06 |
Natural Gas | $190,040 | 47,510 | MMBtu | $4.00 |
TOTAL ENERGY COSTS | $504,631 | |||
RECOMMENDED SAVINGS* | $42,353 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,998 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $13,440 Cost: $30,000 |
- | - | - | - | - | - | $13,440 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$13,440 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,193 Cost: $300 |
- | - | - | - | $4,193 | 2,240,400 | - | - |
- - kWh |
- - MMBtu |
$4,193 2,240,400 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.3121 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS |
Savings: $5,725 Cost: - |
$2,339 | 111,372 | $148 | 43 | $3,238 | 1,730,232 | - | - |
$2,339 111,372 kWh |
$148 43 MMBtu |
$3,238 1,730,232 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,365 Cost: $25,782 |
$4,129 | 55,393 | - | - | - | - | $236 | - |
$4,129 55,393 kWh |
- - MMBtu |
- - Tgal |
$236 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $14,630 Cost: $37,500 |
$14,630 | 266,120 | - | - | - | - | - | - |
$14,630 266,120 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $42,353 Cost: $93,582 |
$21,098 | 432,885 | $148 | 43 | $7,431 | 3,970,632 | $13,676 | - | $21,098 432,885 kWh |
$148 43 MMBtu |
$7,431 3,970,632 Tgal |
$13,676 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,998 Cost: $56,082 |
$4,129 | 55,393 | - | - | $4,193 | 2,240,400 | $13,676 | - | $4,129 55,393 kWh |
- - MMBtu |
$4,193 2,240,400 Tgal |
$13,676 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Administrative Changes |