IAC Assessment: UD0477
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1995
Principal Product corrugated shipping containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 91
Plant Area (Sq.Ft.) 140,000
Annual Production 40,000 Tons
Production Hrs. Annual 6,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $220,577 3,669,695 kWh $0.06
Natural Gas $150,000 47,865 MMBtu $3.13
TOTAL ENERGY COSTS $370,577
RECOMMENDED SAVINGS* $51,863 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,004
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes
$ kWh $ MMBtu $ Tgal $ $
01: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$1,927
Cost:
-
- - $1,927 622 - - - - -
-
kWh
$1,927
622
MMBtu
-
-
Tgal
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,045
Cost:
$4,000
- - $6,045 1,950 - - - - -
-
kWh
$6,045
1,950
MMBtu
-
-
Tgal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,867
Cost:
$5,759
$2,867 34,291 - - - - - - $2,867
34,291
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,444
Cost:
$4,300
$3,129 63,892 - - - - $315 - $3,129
63,892
kWh
-
-
MMBtu
-
-
Tgal
$315
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,196
Cost:
$21,000
$3,969 81,184 $(-613) (-198) - - $2,840 - $3,969
81,184
kWh
$(-613)
(-198)
MMBtu
-
-
Tgal
$2,840
-
$
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$3,150
Cost:
$250
- - - - - - $3,150 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$3,150
-
$
07: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$1,625
Cost:
$600
- - - - $1,625 250,000,000 - - -
-
kWh
-
-
MMBtu
$1,625
250,000,000
Tgal
-
-
$
08: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$10,234
Cost:
$2,500
- - $484 156 $9,750 1,500,000,000 - - -
-
kWh
$484
156
MMBtu
$9,750
1,500,000,000
Tgal
-
-
$
09: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$16,375
Cost:
$7,500
- - $775 250 $15,600 2,400,000,000 - - -
-
kWh
$775
250
MMBtu
$15,600
2,400,000,000
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$51,863
Cost:
$45,909
$9,965 179,367 $8,618 2,780 $26,975 4,150,000,000 $6,305 - $9,965
179,367
kWh
$8,618
2,780
MMBtu
$26,975
4,150,000,000
Tgal
$6,305
-
$
TOTAL IMPLEMENTED Savings:
$40,004
Cost:
$42,809
$9,965 179,367 $8,134 2,624 $15,600 2,400,000,000 $6,305 - $9,965
179,367
kWh
$8,134
2,624
MMBtu
$15,600
2,400,000,000
Tgal
$6,305
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes