IAC logo
IAC Assessment: UD0486
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0486
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product exhaust system fasteners
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 55,000
Annual Production 0 Units
Production Hrs. Annual 3,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,286 949,590 kWh $0.04
Electricity Demand $50,717 4,188 kW-months/year $12.11
Natural Gas $7,138 1,480 MMBtu $4.82
TOTAL ENERGY COSTS $92,141
RECOMMENDED SAVINGS* $16,028 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,028
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$558
Cost:
-
$202 7,620 $492 60 $(-136) (-34) - - - - $202
7,620
kWh
$492
60
kW-months/year
$(-136)
(-34)
MMBtu
-
-
gal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,870
Cost:
-
$2,940 109,027 $5,910 420 $(-660) (-166) - - $680 - $2,940
109,027
kWh
$5,910
420
kW-months/year
$(-660)
(-166)
MMBtu
-
-
gal
$680
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$360
Cost:
$1,000
- - - - $360 90 - - - - -
-
kWh
-
-
kW-months/year
$360
90
MMBtu
-
-
gal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,390
Cost:
$7,435
$1,060 39,273 $2,330 165 - - - - - - $1,060
39,273
kWh
$2,330
165
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$2,850
Cost:
$17,500
- - - - - - $2,850 1,260 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,850
1,260
gal
-
-
$
TOTAL RECOMMENDED Savings:
$16,028
Cost:
$25,935
$4,202 155,920 $8,732 645 $(-436) (-110) $2,850 1,260 $680 - $4,202
155,920
kWh
$8,732
645
kW-months/year
$(-436)
(-110)
MMBtu
$2,850
1,260
gal
$680
-
$
TOTAL IMPLEMENTED Savings:
$16,028
Cost:
$25,935
$4,202 155,920 $8,732 645 $(-436) (-110) $2,850 1,260 $680 - $4,202
155,920
kWh
$8,732
645
kW-months/year
$(-436)
(-110)
MMBtu
$2,850
1,260
gal
$680
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost