IAC logo
IAC Assessment: UD0488
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0488
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product hospital communication equipment
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 49
Plant Area (Sq.Ft.) 70,000
Annual Production 0 Units
Production Hrs. Annual 3,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,826 916,471 kWh $0.03
Electricity Demand $49,409 4,080 kW-months/year $12.11
Natural Gas $26,839 6,181 MMBtu $4.34
TOTAL ENERGY COSTS $106,074
RECOMMENDED SAVINGS* $16,249 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,252
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,372
Cost:
$4,000
- - $4,372 360 - - - - -
-
kWh
$4,372
360
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$6,843
Cost:
$3,000
$2,746 85,873 $3,197 264 - - $900 - $2,746
85,873
kWh
$3,197
264
kW-months/year
-
-
MMBtu
$900
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$997
Cost:
$2,500
- - - - $997 232 - - -
-
kWh
-
-
kW-months/year
$997
232
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,037
Cost:
$8,010
$1,632 50,996 $2,405 198 - - - - $1,632
50,996
kWh
$2,405
198
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$16,249
Cost:
$17,510
$4,378 136,869 $9,974 822 $997 232 $900 - $4,378
136,869
kWh
$9,974
822
kW-months/year
$997
232
MMBtu
$900
-
$
TOTAL IMPLEMENTED Savings:
$15,252
Cost:
$15,010
$4,378 136,869 $9,974 822 - - $900 - $4,378
136,869
kWh
$9,974
822
kW-months/year
-
-
MMBtu
$900
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost