IAC Assessment: UD0493
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0493
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product residential roofing
NAICS n/a
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 135,300
Annual Production 150,000 Tons
Production Hrs. Annual 8,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $156,798 5,751,172 kWh $0.03
Electricity Demand $130,643 10,788 kW-months/year $12.11
Natural Gas $271,801 109,909 MMBtu $2.47
TOTAL ENERGY COSTS $559,242
RECOMMENDED SAVINGS* $65,365 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,101
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $
01: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$2,375
Cost:
$500
- - - - $2,375 950 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,375
950
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$10,368
Cost:
$9,000
- - - - $4,168 1,667 - - $6,200 - - - - - -
-
kWh
-
-
kW-months/year
$4,168
1,667
MMBtu
-
-
Tgal
$6,200
-
gal
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$14,952
Cost:
$2,500
$6,248 297,479 $6,579 420 - - - - - - - - $2,125 - $6,248
297,479
kWh
$6,579
420
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
$2,125
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,741
Cost:
$1,375
$445 21,102 $1,026 66 - - - - - - $270 - - - $445
21,102
kWh
$1,026
66
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$270
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,907
Cost:
$15,000
$2,088 99,355 $2,199 140 - - - - - - $620 - - - $2,088
99,355
kWh
$2,199
140
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$620
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,431
Cost:
$5,975
$1,018 48,359 $1,078 68 - - - - - - $335 - - - $1,018
48,359
kWh
$1,078
68
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$335
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,554
Cost:
$5,953
$797 38,101 $1,757 112 - - - - - - - - - - $797
38,101
kWh
$1,757
112
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
08: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$11,264
Cost:
$45,000
$(-1,940) (-92,321) $(-2,256) (-144) - - $15,960 11,369,600 - - $(-500) - - - $(-1,940)
(-92,321)
kWh
$(-2,256)
(-144)
kW-months/year
-
-
MMBtu
$15,960
11,369,600
Tgal
-
-
gal
$(-500)
-
$
-
-
$
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$14,773
Cost:
$34,000
$(-563) (-25,498) $(-564) (-36) - - $18,900 13,464,000 - - $(-3,000) - - - $(-563)
(-25,498)
kWh
$(-564)
(-36)
kW-months/year
-
-
MMBtu
$18,900
13,464,000
Tgal
-
-
gal
$(-3,000)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$65,365
Cost:
$119,303
$8,093 386,577 $9,819 626 $6,543 2,617 $34,860 24,833,600 $6,200 - $(-2,275) - $2,125 - $8,093
386,577
kWh
$9,819
626
kW-months/year
$6,543
2,617
MMBtu
$34,860
24,833,600
Tgal
$6,200
-
gal
$(-2,275)
-
$
$2,125
-
$
TOTAL IMPLEMENTED Savings:
$54,101
Cost:
$74,303
$10,033 478,898 $12,075 770 $6,543 2,617 $18,900 13,464,000 $6,200 - $(-1,775) - $2,125 - $10,033
478,898
kWh
$12,075
770
kW-months/year
$6,543
2,617
MMBtu
$18,900
13,464,000
Tgal
$6,200
-
gal
$(-1,775)
-
$
$2,125
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Ancillary Material Cost