IAC Assessment: UD0496
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0496
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product corrugated boxes
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 64
Plant Area (Sq.Ft.) 130,800
Annual Production 25,000 Pounds
Production Hrs. Annual 4,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,911 3,738,570 kWh $0.02
Electricity Demand $125,847 10,392 kW-months/year $12.11
Natural Gas $104,062 35,073 MMBtu $2.97
TOTAL ENERGY COSTS $320,820
RECOMMENDED SAVINGS* $30,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,405
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,040
Cost:
$1,500
- - - - $2,040 680 - - -
-
kWh
-
-
kW-months/year
$2,040
680
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,270
Cost:
$5,000
$1,680 80,012 $3,760 240 $(-1,170) (-390) - - $1,680
80,012
kWh
$3,760
240
kW-months/year
$(-1,170)
(-390)
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$17,005
Cost:
$30,000
$6,615 315,064 $15,790 1,008 $(-5,400) (-1,800) - - $6,615
315,064
kWh
$15,790
1,008
kW-months/year
$(-5,400)
(-1,800)
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$365
Cost:
$1,720
$116 5,569 $231 15 - - $18 - $116
5,569
kWh
$231
15
kW-months/year
-
-
MMBtu
$18
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,485
Cost:
$18,550
$2,429 115,768 $4,832 308 $(-776) (-258) - - $2,429
115,768
kWh
$4,832
308
kW-months/year
$(-776)
(-258)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$30,165
Cost:
$56,770
$10,840 516,413 $24,613 1,571 $(-5,306) (-1,768) $18 - $10,840
516,413
kWh
$24,613
1,571
kW-months/year
$(-5,306)
(-1,768)
MMBtu
$18
-
$
TOTAL IMPLEMENTED Savings:
$2,405
Cost:
$3,220
$116 5,569 $231 15 $2,040 680 $18 - $116
5,569
kWh
$231
15
kW-months/year
$2,040
680
MMBtu
$18
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes