IAC logo
IAC Assessment: UD0504
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0504
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product reconditioned drums
NAICS n/a
SIC 3412 - Metal Barrels, Drums, And Pails
Sales $5,000,000-$10,000,000
# of Employees 175
Plant Area (Sq.Ft.) 68,000
Annual Production 750,000 Pieces
Production Hrs. Annual 3,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,321 3,782,239 kWh $0.02
Electricity Demand $87,047 7,188 kW-months/year $12.11
Natural Gas $247,800 70,793 MMBtu $3.50
TOTAL ENERGY COSTS $490,631
RECOMMENDED SAVINGS* $77,251 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,816
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ Tgal
01: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$6,379
Cost:
$1,500
- - - - $5,426 750,244 - - - - $953 - -
-
kWh
-
-
kW-months/year
$5,426
750,244
Tgal
-
-
$
-
-
$
$953
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$54,934
Cost:
$80,000
$34,008 414,127 $20,926 1,728 - - - - - - - - $34,008
414,127
kWh
$20,926
1,728
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,121
Cost:
$500
$1,896 60,082 $2,725 225 - - - - $500 - - - $1,896
60,082
kWh
$2,725
225
kW-months/year
-
-
Tgal
-
-
$
$500
-
$
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,825
Cost:
$5,650
$602 19,050 $1,203 99 - - $20 - - - - - $602
19,050
kWh
$1,203
99
kW-months/year
-
-
Tgal
$20
-
$
-
-
$
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,610
Cost:
$1,160
$548 17,292 $421 35 - - $1,641 - - - - - $548
17,292
kWh
$421
35
kW-months/year
-
-
Tgal
$1,641
-
$
-
-
$
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,382
Cost:
$16,530
$3,539 111,958 $2,843 235 - - - - - - - - $3,539
111,958
kWh
$2,843
235
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$77,251
Cost:
$105,340
$40,593 622,509 $28,118 2,322 $5,426 750,244 $1,661 - $500 - $953 - $40,593
622,509
kWh
$28,118
2,322
kW-months/year
$5,426
750,244
Tgal
$1,661
-
$
$500
-
$
$953
-
Tgal
TOTAL IMPLEMENTED Savings:
$72,816
Cost:
$98,530
$39,443 586,167 $26,494 2,188 $5,426 750,244 - - $500 - $953 - $39,443
586,167
kWh
$26,494
2,188
kW-months/year
$5,426
750,244
Tgal
-
-
$
$500
-
$
$953
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Water Consumption