IAC logo
IAC Assessment: UD0505
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0505
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product military rations
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 189,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 4,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,611 3,910,317 kWh $0.04
Electricity Demand $125,856 10,432 kW-months/year $12.06
Natural Gas $137,761 29,084 MMBtu $4.74
TOTAL ENERGY COSTS $517,007
RECOMMENDED SAVINGS* $51,632 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,632
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $ $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,351
Cost:
$9,000
- - $12,351 828 - - - - - - - - - - - - -
-
kWh
$12,351
828
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$15,214
Cost:
-
- - $16,294 1,080 - - - - - - $(-1,080) - - - - - -
-
kWh
$16,294
1,080
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$(-1,080)
-
$
-
-
$
-
-
Tgal
03: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING Savings:
$8,648
Cost:
$4,000
$(-298) (-15,240) $(-602) (-38) - - $9,548 2,879,800 - - - - - - - - $(-298)
(-15,240)
kWh
$(-602)
(-38)
kW-months/year
-
-
MMBtu
$9,548
2,879,800
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,221
Cost:
$500
$1,447 74,736 - - - - $2,580 1,439,900 - - - - $1,000 - $2,194 - $1,447
74,736
kWh
-
-
kW-months/year
-
-
MMBtu
$2,580
1,439,900
Tgal
-
-
$
-
-
$
$1,000
-
$
$2,194
-
Tgal
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,110
Cost:
$6,000
$291 14,947 - - $3,819 813 - - - - - - - - - - $291
14,947
kWh
-
-
kW-months/year
$3,819
813
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,448
Cost:
$1,000
$729 37,515 $1,476 94 - - - - $243 - - - - - - - $729
37,515
kWh
$1,476
94
kW-months/year
-
-
MMBtu
-
-
Tgal
$243
-
$
-
-
$
-
-
$
-
-
Tgal
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,640
Cost:
-
- - - - - - $1,640 915,552 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,640
915,552
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$51,632
Cost:
$20,500
$2,169 111,958 $29,519 1,964 $3,819 813 $13,768 5,235,252 $243 - $(-1,080) - $1,000 - $2,194 - $2,169
111,958
kWh
$29,519
1,964
kW-months/year
$3,819
813
MMBtu
$13,768
5,235,252
Tgal
$243
-
$
$(-1,080)
-
$
$1,000
-
$
$2,194
-
Tgal
TOTAL IMPLEMENTED Savings:
$51,632
Cost:
$20,500
$2,169 111,958 $29,519 1,964 $3,819 813 $13,768 5,235,252 $243 - $(-1,080) - $1,000 - $2,194 - $2,169
111,958
kWh
$29,519
1,964
kW-months/year
$3,819
813
MMBtu
$13,768
5,235,252
Tgal
$243
-
$
$(-1,080)
-
$
$1,000
-
$
$2,194
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption