IAC logo
IAC Assessment: UD0509
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0509
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product Silicon Powder
NAICS n/a
SIC 2899 - Chemical Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 100,000
Annual Production 0 Units
Production Hrs. Annual 8,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $342,734 16,325,323 kWh $0.02
Electricity Demand $410,450 29,172 kW-months/year $14.07
Natural Gas $649,094 184,187 MMBtu $3.52
TOTAL ENERGY COSTS $1,868,061
RECOMMENDED SAVINGS* $258,433 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,723
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$71,145
Cost:
$170,000
$31,805 1,514,654 $39,340 2,796 - - - - - - - - $31,805
1,514,654
kWh
$39,340
2,796
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,840
Cost:
-
$4,846 230,657 $5,994 426 - - - - - - - - $4,846
230,657
kWh
$5,994
426
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,600
Cost:
$5,000
$5,600 99,648 - - - - - - - - - - $5,600
99,648
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
04: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$160,244
Cost:
$100,000
- - - - $160,244 630,054 - - - - - - -
-
kWh
-
-
kW-months/year
$160,244
630,054
Tgal
-
-
gal
-
-
lb
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,320
Cost:
-
- - - - - - $1,320 330 - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,320
330
gal
-
-
lb
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$4,442
Cost:
-
- - - - - - - - $4,442 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$4,442
-
lb
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,279
Cost:
$621
$333 15,826 $724 51 - - - - - - $222 - $333
15,826
kWh
$724
51
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
$222
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,559
Cost:
$3,600
$647 30,774 $604 43 - - - - - - $308 - $647
30,774
kWh
$604
43
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
$308
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$512
Cost:
$1,600
$230 10,844 $215 15 - - - - - - $67 - $230
10,844
kWh
$215
15
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
$67
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,492
Cost:
$3,080
$771 36,635 $721 51 - - - - - - - - $771
36,635
kWh
$721
51
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$258,433
Cost:
$283,901
$44,232 1,939,038 $47,598 3,382 $160,244 630,054 $1,320 330 $4,442 - $597 - $44,232
1,939,038
kWh
$47,598
3,382
kW-months/year
$160,244
630,054
Tgal
$1,320
330
gal
$4,442
-
lb
$597
-
$
TOTAL IMPLEMENTED Savings:
$19,723
Cost:
$10,301
$11,780 393,610 $7,654 543 - - - - - - $289 - $11,780
393,610
kWh
$7,654
543
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
$289
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes