Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1997 |
Principal Product | Specialty Steel Products |
NAICS | n/a |
SIC | 3444 - Sheet Metalwork |
Sales | $1,000,000-$5,000,000 |
# of Employees | 24 |
Plant Area (Sq.Ft.) | 18,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 2,750 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $14,222 | 128,370 | kWh | $0.11 |
Electricity Demand | $339 | 28 | kW-months/year | $12.11 |
Electricity Fees | $59 | - | $ | - |
Natural Gas | $10,135 | 1,990 | MMBtu | $5.09 |
TOTAL ENERGY COSTS | $24,755 | |||
RECOMMENDED SAVINGS* | $10,418 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,805 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $8,408 Cost: $6,000 |
- | - | - | - | $4,408 | 866 | $4,000 | - |
- - kWh |
- - kW-months/year |
$4,408 866 MMBtu |
$4,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,347 Cost: $4,436 |
$532 | 16,706 | $877 | 72 | - | - | $(-62) | - |
$532 16,706 kWh |
$877 72 kW-months/year |
- - MMBtu |
$(-62) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $266 Cost: $300 |
$95 | 2,931 | $157 | 13 | - | - | $14 | - |
$95 2,931 kWh |
$157 13 kW-months/year |
- - MMBtu |
$14 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $246 Cost: - |
$246 | 7,620 | - | - | - | - | - | - |
$246 7,620 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $151 Cost: $20 |
$57 | 1,758 | $94 | 8 | - | - | - | - |
$57 1,758 kWh |
$94 8 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,418 Cost: $10,756 |
$930 | 29,015 | $1,128 | 93 | $4,408 | 866 | $3,952 | - | $930 29,015 kWh |
$1,128 93 kW-months/year |
$4,408 866 MMBtu |
$3,952 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,805 Cost: $6,020 |
$303 | 9,378 | $94 | 8 | $4,408 | 866 | $4,000 | - | $303 9,378 kWh |
$94 8 kW-months/year |
$4,408 866 MMBtu |
$4,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |