Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1997 |
Principal Product | Large presision machined metal products |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $66,279 | 3,157,093 | kWh | $0.02 |
Electricity Demand | $93,832 | 5,988 | kW-months/year | $15.67 |
Natural Gas | $17,917 | 3,096 | MMBtu | $5.79 |
TOTAL ENERGY COSTS | $178,028 | |||
RECOMMENDED SAVINGS* | $55,850 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,283 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Primary Product | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Primary Product | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $5,304 Cost: $14,840 |
- | - | - | - | $(-3,371) | (-624) | $9,675 | 38,700 | $(-1,000) | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$(-3,371) (-624) MMBtu |
$9,675 38,700 gal |
$(-1,000) - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $12,472 Cost: $24,000 |
- | - | - | - | $4,597 | 794 | - | - | $7,875 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,597 794 MMBtu |
- - gal |
$7,875 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,380 Cost: $17,325 |
$1,381 | 65,944 | $1,439 | 92 | - | - | - | - | $560 | - | - | - | - | - |
$1,381 65,944 kWh |
$1,439 92 kW-months/year |
- - MMBtu |
- - gal |
$560 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,791 Cost: $3,843 |
$507 | 24,033 | $1,284 | 82 | - | - | - | - | - | - | - | - | - | - |
$507 24,033 kWh |
$1,284 82 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM |
Savings: $26,134 Cost: - |
- | - | - | - | - | - | - | - | $15,000 | - | $4,320 | - | $6,814 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$15,000 - $ |
$4,320 - $ |
$6,814 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,769 Cost: $80 |
$3,328 | 153,869 | $3,441 | 220 | - | - | - | - | - | - | - | - | - | - |
$3,328 153,869 kWh |
$3,441 220 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $55,850 Cost: $60,088 |
$5,216 | 243,846 | $6,164 | 394 | $1,226 | 170 | $9,675 | 38,700 | $22,435 | - | $4,320 | - | $6,814 | - | $5,216 243,846 kWh |
$6,164 394 kW-months/year |
$1,226 170 MMBtu |
$9,675 38,700 gal |
$22,435 - $ |
$4,320 - $ |
$6,814 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,283 Cost: $17,405 |
$4,709 | 219,813 | $4,880 | 312 | - | - | - | - | $15,560 | - | $4,320 | - | $6,814 | - | $4,709 219,813 kWh |
$4,880 312 kW-months/year |
- - MMBtu |
- - gal |
$15,560 - $ |
$4,320 - $ |
$6,814 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Primary Product | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Primary Product | By-product Production |