IAC logo
IAC Assessment: UD0520
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0520
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1997
Principal Product Large presision machined metal products
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 70,000
Annual Production 0 Pieces
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,279 3,157,093 kWh $0.02
Electricity Demand $93,832 5,988 kW-months/year $15.67
Natural Gas $17,917 3,096 MMBtu $5.79
TOTAL ENERGY COSTS $178,028
RECOMMENDED SAVINGS* $55,850 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,283
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$5,304
Cost:
$14,840
- - - - $(-3,371) (-624) $9,675 38,700 $(-1,000) - - - - - -
-
kWh
-
-
kW-months/year
$(-3,371)
(-624)
MMBtu
$9,675
38,700
gal
$(-1,000)
-
$
-
-
$
-
-
$
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$12,472
Cost:
$24,000
- - - - $4,597 794 - - $7,875 - - - - - -
-
kWh
-
-
kW-months/year
$4,597
794
MMBtu
-
-
gal
$7,875
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,380
Cost:
$17,325
$1,381 65,944 $1,439 92 - - - - $560 - - - - - $1,381
65,944
kWh
$1,439
92
kW-months/year
-
-
MMBtu
-
-
gal
$560
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,791
Cost:
$3,843
$507 24,033 $1,284 82 - - - - - - - - - - $507
24,033
kWh
$1,284
82
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
05: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$26,134
Cost:
-
- - - - - - - - $15,000 - $4,320 - $6,814 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$15,000
-
$
$4,320
-
$
$6,814
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,769
Cost:
$80
$3,328 153,869 $3,441 220 - - - - - - - - - - $3,328
153,869
kWh
$3,441
220
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$55,850
Cost:
$60,088
$5,216 243,846 $6,164 394 $1,226 170 $9,675 38,700 $22,435 - $4,320 - $6,814 - $5,216
243,846
kWh
$6,164
394
kW-months/year
$1,226
170
MMBtu
$9,675
38,700
gal
$22,435
-
$
$4,320
-
$
$6,814
-
$
TOTAL IMPLEMENTED Savings:
$36,283
Cost:
$17,405
$4,709 219,813 $4,880 312 - - - - $15,560 - $4,320 - $6,814 - $4,709
219,813
kWh
$4,880
312
kW-months/year
-
-
MMBtu
-
-
gal
$15,560
-
$
$4,320
-
$
$6,814
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Primary Product By-product Production