IAC logo
IAC Assessment: UD0524
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0524
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1997
Principal Product Commercial Printing
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 88
Plant Area (Sq.Ft.) 82,000
Annual Production 0 Thousand Feet
Production Hrs. Annual 6,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,427 2,555,979 kWh $0.02
Electricity Demand $69,581 5,988 kW-months/year $11.62
Natural Gas $22,979 3,993 MMBtu $5.75
TOTAL ENERGY COSTS $146,987
RECOMMENDED SAVINGS* $22,925 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,357
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$1,145
Cost:
-
- - - - $1,595 275 $(-450) - - - -
-
kWh
-
-
kW-months/year
$1,595
275
MMBtu
$(-450)
-
$
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,914
Cost:
$9,400
$128 5,862 - - $1,786 305 - - - - $128
5,862
kWh
-
-
kW-months/year
$1,786
305
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$9,568
Cost:
-
$3,129 146,835 $3,012 264 $2,294 396 - - $1,133 - $3,129
146,835
kWh
$3,012
264
kW-months/year
$2,294
396
MMBtu
-
-
$
$1,133
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,898
Cost:
$16,158
$2,737 130,422 $2,161 192 - - - - - - $2,737
130,422
kWh
$2,161
192
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.3311 REPLACE DC EQUIPMENT WITH AC EQUIPMENT Savings:
$5,400
Cost:
$22,500
- - - - - - $5,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,400
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,925
Cost:
$48,058
$5,994 283,119 $5,173 456 $5,675 976 $4,950 - $1,133 - $5,994
283,119
kWh
$5,173
456
kW-months/year
$5,675
976
MMBtu
$4,950
-
$
$1,133
-
$
TOTAL IMPLEMENTED Savings:
$13,357
Cost:
$48,058
$2,865 136,284 $2,161 192 $3,381 580 $4,950 - - - $2,865
136,284
kWh
$2,161
192
kW-months/year
$3,381
580
MMBtu
$4,950
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $