IAC Assessment: UD0528
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0528
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1997
Principal Product adhesives, resins
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 57,000
Annual Production 0 Pieces
Production Hrs. Annual 2,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,565 464,537 kWh $0.07
Electricity Demand $8,268 2,088 kW-months/year $3.96
Natural Gas $68,181 13,227 MMBtu $5.15
TOTAL ENERGY COSTS $107,014
RECOMMENDED SAVINGS* $15,786 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,927
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$4,108
Cost:
-
- - - - $4,108 921 - - - - - - -
-
kWh
-
-
kW-months/year
$4,108
921
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,857
Cost:
$10,000
$1,974 29,894 $571 144 - - - - $312 - - - $1,974
29,894
kWh
$571
144
kW-months/year
-
-
MMBtu
-
-
Tgal
$312
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,076
Cost:
$5,818
$1,818 27,550 $524 134 - - - - $734 - - - $1,818
27,550
kWh
$524
134
kW-months/year
-
-
MMBtu
-
-
Tgal
$734
-
$
-
-
Tgal
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,886
Cost:
$200
- - - - - - $2,886 1,099,476 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,886
1,099,476
Tgal
-
-
$
-
-
Tgal
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$2,859
Cost:
$11,000
- - - - - - - - - - $2,859 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$2,859
-
Tgal
TOTAL RECOMMENDED Savings:
$15,786
Cost:
$27,018
$3,792 57,444 $1,095 278 $4,108 921 $2,886 1,099,476 $1,046 - $2,859 - $3,792
57,444
kWh
$1,095
278
kW-months/year
$4,108
921
MMBtu
$2,886
1,099,476
Tgal
$1,046
-
$
$2,859
-
Tgal
TOTAL IMPLEMENTED Savings:
$12,927
Cost:
$16,018
$3,792 57,444 $1,095 278 $4,108 921 $2,886 1,099,476 $1,046 - - - $3,792
57,444
kWh
$1,095
278
kW-months/year
$4,108
921
MMBtu
$2,886
1,099,476
Tgal
$1,046
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption