IAC logo
IAC Assessment: UD0530
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0530
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1997
Principal Product Plastic Products, toy balls
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 286,000
Annual Production 30,000,000 Pieces
Production Hrs. Annual 6,480
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,105 5,787,222 kWh $0.02
Electricity Demand $260,021 11,112 kW-months/year $23.40
Natural Gas $355,377 107,888 MMBtu $3.29
TOTAL ENERGY COSTS $802,444
RECOMMENDED SAVINGS* $149,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,652
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$3,055
Cost:
$2,200
- - - - $3,055 154 - - - - -
-
kWh
-
-
kW-months/year
$3,055
154
MMBtu
-
-
Tgal
-
-
$
02: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$3,250
Cost:
$5,600
$116 4,982 $3,134 134 - - - - - - $116
4,982
kWh
$3,134
134
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$34,540
Cost:
$37,500
$8,208 356,975 $23,888 1,021 $(-4,606) (-1,400) - - $7,050 - $8,208
356,975
kWh
$23,888
1,021
kW-months/year
$(-4,606)
(-1,400)
MMBtu
-
-
Tgal
$7,050
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$24,402
Cost:
-
- - $24,402 1,043 - - - - - - -
-
kWh
$24,402
1,043
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$51,015
Cost:
$200,000
- - - - $20,043 6,092 $3,072 599,850 $27,900 - -
-
kWh
-
-
kW-months/year
$20,043
6,092
MMBtu
$3,072
599,850
Tgal
$27,900
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$32,833
Cost:
$66,000
$(-363) (-15,826) $(-615) 53 $33,811 10,277 - - - - $(-363)
(-15,826)
kWh
$(-615)
53
kW-months/year
$33,811
10,277
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$149,095
Cost:
$311,300
$7,961 346,131 $50,809 2,251 $52,303 15,123 $3,072 599,850 $34,950 - $7,961
346,131
kWh
$50,809
2,251
kW-months/year
$52,303
15,123
MMBtu
$3,072
599,850
Tgal
$34,950
-
$
TOTAL IMPLEMENTED Savings:
$27,652
Cost:
$5,600
$116 4,982 $27,536 1,177 - - - - - - $116
4,982
kWh
$27,536
1,177
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes