IAC logo
IAC Assessment: UD0532
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0532
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1997
Principal Product sheet metal work, stampings
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 69,000
Annual Production 0 Units
Production Hrs. Annual 7,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,964 2,027,257 kWh $0.02
Electricity Demand $52,987 380 kW-months/year $139.44
Natural Gas $110,415 20,646 MMBtu $5.35
TOTAL ENERGY COSTS $206,366
RECOMMENDED SAVINGS* $31,620 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,098
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,469
Cost:
-
$2,820 133,060 $2,649 228 - - - - - - - - $2,820
133,060
kWh
$2,649
228
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,083
Cost:
$15,018
$1,921 90,563 $3,162 276 - - - - - - - - $1,921
90,563
kWh
$3,162
276
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,422
Cost:
$637
$711 33,411 $711 61 - - - - - - - - $711
33,411
kWh
$711
61
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$123
Cost:
$2,000
$62 2,052 $61 5 - - - - - - - - $62
2,052
kWh
$61
5
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
05: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$580
Cost:
-
- - - - - - $486 2,700 - - $94 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$486
2,700
gal
-
-
$
$94
-
$
06: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$6,335
Cost:
$5,000
- - - - $6,335 1,167 - - - - - - -
-
kWh
-
-
kW-months/year
$6,335
1,167
MMBtu
-
-
gal
-
-
$
-
-
$
07: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$10,100
Cost:
$20,000
- - - - $10,100 1,860 - - - - - - -
-
kWh
-
-
kW-months/year
$10,100
1,860
MMBtu
-
-
gal
-
-
$
-
-
$
08: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$2,508
Cost:
$4,880
- - - - - - - - $2,508 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,508
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$31,620
Cost:
$47,535
$5,514 259,086 $6,583 570 $16,435 3,027 $486 2,700 $2,508 - $94 - $5,514
259,086
kWh
$6,583
570
kW-months/year
$16,435
3,027
MMBtu
$486
2,700
gal
$2,508
-
$
$94
-
$
TOTAL IMPLEMENTED Savings:
$20,098
Cost:
$26,898
$4,803 225,675 $5,872 509 $6,335 1,167 $486 2,700 $2,508 - $94 - $4,803
225,675
kWh
$5,872
509
kW-months/year
$6,335
1,167
MMBtu
$486
2,700
gal
$2,508
-
$
$94
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes