IAC logo
IAC Assessment: UD0534
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0534
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1997
Principal Product Centrifugals
NAICS n/a
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 140,000
Annual Production 0 Units
Production Hrs. Annual 5,390
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,242 1,575,322 kWh $0.03
Electricity Demand $46,651 5,172 kW-months/year $9.02
Natural Gas $53,152 10,219 MMBtu $5.20
TOTAL ENERGY COSTS $158,034
RECOMMENDED SAVINGS* $76,017 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,801
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ $
01: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,360
Cost:
$6,000
- - - - - - - - - - $1,440 192,000 - - $1,920 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$1,440
192,000
lb
-
-
$
$1,920
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,347
Cost:
$29,176
$4,277 98,769 $4,070 451 - - - - - - - - - - - - - - $4,277
98,769
kWh
$4,070
451
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$9,860
Cost:
$600
$1,790 41,325 $1,377 153 $703 141 - - $5,990 1,169,953 - - - - - - - - $1,790
41,325
kWh
$1,377
153
kW-months/year
$703
141
MMBtu
-
-
MMBtu
$5,990
1,169,953
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$789
Cost:
$400
- - - - - - - - $789 154,099 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$789
154,099
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,454
Cost:
$1,400
- - - - $7,454 1,491 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$7,454
1,491
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$8,275
Cost:
-
- - - - - - - - - - - - $78,400 - $4,875 - $(-75,000) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
$78,400
-
$
$4,875
-
$
$(-75,000)
-
$
07: 4.2120 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$35,000
Cost:
$75,000
- - - - - - $(-5,000) - - - - - $(-20,000) - - - $60,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-5,000)
-
MMBtu
-
-
Tgal
-
-
lb
$(-20,000)
-
$
-
-
$
$60,000
-
$
08: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$2,932
Cost:
$500
- - - - - - - - - - $3,252 - $(-320) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$3,252
-
lb
$(-320)
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$76,017
Cost:
$113,076
$6,067 140,094 $5,447 604 $8,157 1,632 $(-5,000) - $6,779 1,324,052 $4,692 192,000 $58,080 - $6,795 - $(-15,000) - $6,067
140,094
kWh
$5,447
604
kW-months/year
$8,157
1,632
MMBtu
$(-5,000)
-
MMBtu
$6,779
1,324,052
Tgal
$4,692
192,000
lb
$58,080
-
$
$6,795
-
$
$(-15,000)
-
$
TOTAL IMPLEMENTED Savings:
$50,801
Cost:
$105,576
$4,277 98,769 $4,070 451 $7,454 1,491 $(-5,000) - - - - - $(-20,000) - - - $60,000 - $4,277
98,769
kWh
$4,070
451
kW-months/year
$7,454
1,491
MMBtu
$(-5,000)
-
MMBtu
-
-
Tgal
-
-
lb
$(-20,000)
-
$
-
-
$
$60,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material