IAC logo
IAC Assessment: UD0535
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0535
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1998
Principal Product Lubricants Oils, Calcium Oxide
NAICS n/a
SIC 2589 -
Sales $5,000,000-$10,000,000
# of Employees 42
Plant Area (Sq.Ft.) 40,000
Annual Production 13,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,842 776,671 kWh $0.03
Electricity Demand $36,330 3,000 kW-months/year $12.11
Natural Gas $32,208 5,268 MMBtu $6.11
TOTAL ENERGY COSTS $93,380
RECOMMENDED SAVINGS* $120,354 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,874
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$104,625
Cost:
$25,000
- - - - - - $104,625 - -
-
kWh
-
-
kW-months/year
-
-
lb
$104,625
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,064
Cost:
$43,075
$2,903 90,856 $5,859 484 - - $302 - $2,903
90,856
kWh
$5,859
484
kW-months/year
-
-
lb
$302
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,333
Cost:
$9,720
$1,104 34,584 $2,229 184 - - - - $1,104
34,584
kWh
$2,229
184
kW-months/year
-
-
lb
-
-
$
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,810
Cost:
-
- - - - - - $1,810 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,810
-
$
05: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$1,522
Cost:
$500
- - - - $1,770 - $(-248) - -
-
kWh
-
-
kW-months/year
$1,770
-
lb
$(-248)
-
$
TOTAL RECOMMENDED Savings:
$120,354
Cost:
$78,295
$4,007 125,440 $8,088 668 $1,770 - $106,489 - $4,007
125,440
kWh
$8,088
668
kW-months/year
$1,770
-
lb
$106,489
-
$
TOTAL IMPLEMENTED Savings:
$10,874
Cost:
$43,075
$2,903 90,856 $5,859 484 - - $2,112 - $2,903
90,856
kWh
$5,859
484
kW-months/year
-
-
lb
$2,112
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes