IAC logo
IAC Assessment: UD0536
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0536
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1998
Principal Product Automotive Parts
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 62,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 6,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,735 2,197,831 kWh $0.02
Electricity Demand $83,238 5,916 kW-months/year $14.07
Natural Gas $8,518 1,747 MMBtu $4.88
TOTAL ENERGY COSTS $155,787
RECOMMENDED SAVINGS* $23,114 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,739
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,739
Cost:
$17,011
$3,045 113,130 $4,694 237 - - - - - - $3,045
113,130
kWh
$4,694
237
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,150
Cost:
$12,500
$5,085 189,039 $4,694 334 $(-3,629) (-756) - - - - $5,085
189,039
kWh
$4,694
334
kW-months/year
$(-3,629)
(-756)
MMBtu
-
-
lb
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,884
Cost:
$(-6,000)
$633 23,447 $2,651 188 - - - - $600 - $633
23,447
kWh
$2,651
188
kW-months/year
-
-
MMBtu
-
-
lb
$600
-
$
04: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$3,341
Cost:
$15,000
- - - - - - $3,341 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,341
-
lb
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,000
Cost:
-
- - - - - - - - $2,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$2,000
-
$
TOTAL RECOMMENDED Savings:
$23,114
Cost:
$38,511
$8,763 325,616 $12,039 759 $(-3,629) (-756) $3,341 - $2,600 - $8,763
325,616
kWh
$12,039
759
kW-months/year
$(-3,629)
(-756)
MMBtu
$3,341
-
lb
$2,600
-
$
TOTAL IMPLEMENTED Savings:
$9,739
Cost:
$17,011
$3,045 113,130 $4,694 237 - - - - $2,000 - $3,045
113,130
kWh
$4,694
237
kW-months/year
-
-
MMBtu
-
-
lb
$2,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes