Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1998 |
Principal Product | Radio Towers, Floating boat docks |
NAICS | n/a |
SIC | 3040 - |
Sales | $1,000,000-$5,000,000 |
# of Employees | 13 |
Plant Area (Sq.Ft.) | 38,000 |
Annual Production | 15,009,600 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $10,186 | 161,782 | kWh | $0.06 |
Electricity Demand | $70 | 99 | kW-months/year | $0.71 |
Natural Gas | $19,343 | 3,273 | MMBtu | $5.91 |
TOTAL ENERGY COSTS | $29,599 | |||
RECOMMENDED SAVINGS* | $14,169 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,677 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $5,890 Cost: - |
- | - | - | - | - | - | - | - | $5,890 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$5,890 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $4,148 Cost: $500 |
- | - | - | - | $4,148 | 703 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,148 703 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $2,651 Cost: - |
- | - | - | - | - | - | $2,651 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,651 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3123 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS |
Savings: $693 Cost: $600 |
- | - | - | - | - | - | $693 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$693 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $201 Cost: - |
$201 | 3,224 | - | - | - | - | - | - | - | - |
$201 3,224 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $586 Cost: $2,820 |
$548 | 8,792 | $38 | 54 | - | - | - | - | - | - |
$548 8,792 kWh |
$38 54 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,169 Cost: $3,920 |
$749 | 12,016 | $38 | 54 | $4,148 | 703 | $3,344 | - | $5,890 | - | $749 12,016 kWh |
$38 54 kW-months/year |
$4,148 703 MMBtu |
$3,344 - $ |
$5,890 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,677 Cost: $2,820 |
$749 | 12,016 | $38 | 54 | - | - | - | - | $5,890 | - | $749 12,016 kWh |
$38 54 kW-months/year |
- - MMBtu |
- - $ |
$5,890 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost |