IAC logo
IAC Assessment: UD0548
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0548
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1998
Principal Product Jigs fixtures,tools and die machinery
NAICS n/a
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 50,000
Annual Production 50,000 Pieces
Production Hrs. Annual 3,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,055 1,271,688 kWh $0.03
Electricity Demand $62,977 4,476 kW-months/year $14.07
Natural Gas $13,704 2,779 MMBtu $4.93
TOTAL ENERGY COSTS $112,747
RECOMMENDED SAVINGS* $15,280 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,225
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$2,243
Cost:
-
- - - - - - $630 300 $(-825) - - - $2,438 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$630
300
gal
$(-825)
-
$
-
-
$
$2,438
-
$
02: 2.5125 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE Savings:
$7,607
Cost:
$720
$744 28,722 $1,604 114 - - - - - - $5,259 - - - $744
28,722
kWh
$1,604
114
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$5,259
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,274
Cost:
$300
$640 24,619 $1,384 98 - - - - - - $250 - - - $640
24,619
kWh
$1,384
98
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$250
-
$
-
-
$
04: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$2,375
Cost:
$1,120
$751 29,015 $1,624 115 - - - - - - - - - - $751
29,015
kWh
$1,624
115
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$781
Cost:
$2,000
$153 5,862 - - $628 128 - - - - - - - - $153
5,862
kWh
-
-
kW-months/year
$628
128
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$15,280
Cost:
$4,140
$2,288 88,218 $4,612 327 $628 128 $630 300 $(-825) - $5,509 - $2,438 - $2,288
88,218
kWh
$4,612
327
kW-months/year
$628
128
MMBtu
$630
300
gal
$(-825)
-
$
$5,509
-
$
$2,438
-
$
TOTAL IMPLEMENTED Savings:
$12,225
Cost:
$1,840
$1,495 57,737 $3,228 229 - - $630 300 $(-825) - $5,259 - $2,438 - $1,495
57,737
kWh
$3,228
229
kW-months/year
-
-
MMBtu
$630
300
gal
$(-825)
-
$
$5,259
-
$
$2,438
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost