IAC logo
IAC Assessment: UD0552
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0552
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1998
Principal Product Botts, nuts, screws, rivets and washers
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $5,000,000-$10,000,000
# of Employees 57
Plant Area (Sq.Ft.) 21,000
Annual Production 750,000,000 Pieces
Production Hrs. Annual 4,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,783 1,550,117 kWh $0.02
Electricity Demand $63,612 4,128 kW-months/year $15.41
Natural Gas $9,748 1,628 MMBtu $5.99
TOTAL ENERGY COSTS $107,143
RECOMMENDED SAVINGS* $235,436 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,618
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
01: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$199,687
Cost:
-
- - - - - - - - $115,312 - $56,250 - $28,125 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$115,312
-
lb
$56,250
-
$
$28,125
-
$
-
-
$
02: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$9,000
Cost:
$12,000
- - - - - - - - - - $9,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$9,000
-
$
-
-
$
-
-
$
03: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$18,478
Cost:
$1,800
- - - - - - $2,812 - - - $10,125 - - - $5,541 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,812
-
gal
-
-
lb
$10,125
-
$
-
-
$
$5,541
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,681
Cost:
$7,118
$1,217 55,979 $2,464 160 - - - - - - - - - - - - $1,217
55,979
kWh
$2,464
160
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,972
Cost:
-
$683 31,360 $1,289 83 - - - - - - - - - - - - $683
31,360
kWh
$1,289
83
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,132
Cost:
$600
$392 17,878 $740 48 - - - - - - - - - - - - $392
17,878
kWh
$740
48
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,486
Cost:
$2,000
$315 14,361 - - $1,171 202 - - - - - - - - - - $315
14,361
kWh
-
-
kW-months/year
$1,171
202
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$235,436
Cost:
$23,518
$2,607 119,578 $4,493 291 $1,171 202 $2,812 - $115,312 - $75,375 - $28,125 - $5,541 - $2,607
119,578
kWh
$4,493
291
kW-months/year
$1,171
202
MMBtu
$2,812
-
gal
$115,312
-
lb
$75,375
-
$
$28,125
-
$
$5,541
-
$
TOTAL IMPLEMENTED Savings:
$2,618
Cost:
$2,600
$707 32,239 $740 48 $1,171 202 - - - - - - - - - - $707
32,239
kWh
$740
48
kW-months/year
$1,171
202
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost