IAC logo
IAC Assessment: UD0555
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0555
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1998
Principal Product Gray iron & ductile castings
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $10,000,000-$50,000,000
# of Employees 320
Plant Area (Sq.Ft.) 165,000
Annual Production 60,000,000 Pounds
Production Hrs. Annual 5,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,826,403 47,958,383 kWh $0.04
Electricity Demand $560,729 156,192 kW-months/year $3.59
Natural Gas $341,077 83,518 MMBtu $4.08
TOTAL ENERGY COSTS $2,738,893
RECOMMENDED SAVINGS* $417,936 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $272,109
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 4.5110 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$237,283
Cost:
$1,313,000
- - - - - - - - $222,750 - $14,533 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$222,750
-
$
$14,533
-
$
-
-
$
02: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$123,160
Cost:
$115,000
- - - - - - - - - - - - $123,160 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$123,160
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$22,667
Cost:
$20,000
- - - - $22,667 6,570 - - - - - - - - -
-
kWh
-
-
kW-months/year
$22,667
6,570
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$17,490
Cost:
-
- - - - - - $1,890 - - - $15,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,890
-
lb
-
-
$
$15,600
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$11,454
Cost:
-
$9,925 263,189 $1,529 426 - - - - - - - - - - $9,925
263,189
kWh
$1,529
426
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,882
Cost:
$17,546
$5,010 132,181 $872 243 - - - - - - - - - - $5,010
132,181
kWh
$872
243
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$417,936
Cost:
$1,465,546
$14,935 395,370 $2,401 669 $22,667 6,570 $1,890 - $222,750 - $30,133 - $123,160 - $14,935
395,370
kWh
$2,401
669
kW-months/year
$22,667
6,570
MMBtu
$1,890
-
lb
$222,750
-
$
$30,133
-
$
$123,160
-
$
TOTAL IMPLEMENTED Savings:
$272,109
Cost:
$1,330,546
$14,935 395,370 $2,401 669 - - $1,890 - $222,750 - $30,133 - - - $14,935
395,370
kWh
$2,401
669
kW-months/year
-
-
MMBtu
$1,890
-
lb
$222,750
-
$
$30,133
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material