Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1998 |
Principal Product | Enviromental systems, continuous emissions monitoring system |
NAICS | n/a |
SIC | 3625 - Relays And Industrial Controls |
Sales | $10,000,000-$50,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 93,900 |
Annual Production | 3,575 Thousand Gallons |
Production Hrs. Annual | 4,400 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $120,643 | 2,750,293 | kWh | $0.04 |
Electricity Demand | $22,901 | 6,240 | kW-months/year | $3.67 |
Natural Gas | $19,135 | 3,271 | MMBtu | $5.85 |
TOTAL ENERGY COSTS | $162,679 | |||
RECOMMENDED SAVINGS* | $39,854 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,786 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $18,790 Cost: $8,000 |
$17,595 | 423,212 | $1,195 | 544 | - | - | - | - | - | - |
$17,595 423,212 kWh |
$1,195 544 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,343 Cost: $45,360 |
$8,212 | 195,487 | $3,131 | 853 | - | - | - | - | - | - |
$8,212 195,487 kWh |
$3,131 853 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $7,068 Cost: $7,600 |
$5,110 | 122,802 | $559 | 152 | - | - | $299 | 82,286 | $1,100 | - |
$5,110 122,802 kWh |
$559 152 kW-months/year |
- - MMBtu |
$299 82,286 Tgal |
$1,100 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $1,453 Cost: $8,000 |
$1,658 | 39,859 | $415 | 113 | $(-620) | (-106) | - | - | - | - |
$1,658 39,859 kWh |
$415 113 kW-months/year |
$(-620) (-106) MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $1,200 Cost: - |
- | - | - | - | - | - | - | - | $1,200 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$1,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,854 Cost: $68,960 |
$32,575 | 781,360 | $5,300 | 1,662 | $(-620) | (-106) | $299 | 82,286 | $2,300 | - | $32,575 781,360 kWh |
$5,300 1,662 kW-months/year |
$(-620) (-106) MMBtu |
$299 82,286 Tgal |
$2,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,786 Cost: $61,360 |
$27,465 | 658,558 | $4,741 | 1,510 | $(-620) | (-106) | - | - | $1,200 | - | $27,465 658,558 kWh |
$4,741 1,510 kW-months/year |
$(-620) (-106) MMBtu |
- - Tgal |
$1,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes |