Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1999 |
Principal Product | Bottled soft drinks |
NAICS | n/a |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $100,000,000-$500,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 12,800,000 Pieces |
Production Hrs. Annual | 6,912 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $176,629 | 5,641,852 | kWh | $0.03 |
Electricity Demand | $136,587 | 12,372 | kW-months/year | $11.04 |
Natural Gas | $53,050 | 16,111 | MMBtu | $3.29 |
TOTAL ENERGY COSTS | $468,842 | |||
RECOMMENDED SAVINGS* | $1,025,203 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $48,417 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Administrative Changes | Primary Product | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Administrative Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE |
Savings: $948,600 Cost: $580,553 |
- | - | - | - | - | - | - | - | $129,600 | - | $819,000 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - $ |
$129,600 - $ |
$819,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD |
Savings: $38,960 Cost: $110,457 |
- | - | - | - | - | - | - | - | $38,960 | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - $ |
$38,960 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $28,186 Cost: $41,000 |
$(-737) | (-36,928) | $(-706) | (-64) | $31,629 | 4,147,200 | $(-2,000) | - | - | - | - | - |
$(-737) (-36,928) kWh |
$(-706) (-64) kW-months/year |
$31,629 4,147,200 Tgal |
$(-2,000) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $9,457 Cost: $(-27,115) |
$4,159 | 208,089 | $5,298 | 480 | - | - | - | - | - | - | - | - |
$4,159 208,089 kWh |
$5,298 480 kW-months/year |
- - Tgal |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,025,203 Cost: $704,895 |
$3,422 | 171,161 | $4,592 | 416 | $31,629 | 4,147,200 | $(-2,000) | - | $168,560 | - | $819,000 | - | $3,422 171,161 kWh |
$4,592 416 kW-months/year |
$31,629 4,147,200 Tgal |
$(-2,000) - $ |
$168,560 - $ |
$819,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $48,417 Cost: $83,342 |
$4,159 | 208,089 | $5,298 | 480 | - | - | - | - | $38,960 | - | - | - | $4,159 208,089 kWh |
$5,298 480 kW-months/year |
- - Tgal |
- - $ |
$38,960 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Administrative Changes | Primary Product | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Administrative Changes | Primary Product |