IAC logo
IAC Assessment: UD0573
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0573
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1999
Principal Product Aluminum castings
NAICS n/a
SIC 3365 - Aluminum Foundries
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 175,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 3,920
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $264,815 12,512,017 kWh $0.02
Electricity Demand $341,359 24,348 kW-months/year $14.02
Natural Gas $362,868 111,686 MMBtu $3.25
TOTAL ENERGY COSTS $969,042
RECOMMENDED SAVINGS* $449,580 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $407,265
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$238,622
Cost:
-
- - - - - - - - $219,872 - $18,750 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$219,872
-
$
$18,750
-
$
-
-
$
02: 3.5221 RECYCLE CASTING SAND Savings:
$159,120
Cost:
$310,000
$3,213 152,989 $15,007 1,070 - - - - $65,300 - - - $75,600 - $3,213
152,989
kWh
$15,007
1,070
kW-months/year
-
-
MMBtu
-
-
Tgal
$65,300
-
$
-
-
$
$75,600
-
$
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$30,590
Cost:
$30,500
- - - - $30,590 9,412 - - - - - - - - -
-
kWh
-
-
kW-months/year
$30,590
9,412
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,431
Cost:
$6,000
$1,574 75,029 $3,197 228 $7,426 2,285 - - $(-1,766) - - - - - $1,574
75,029
kWh
$3,197
228
kW-months/year
$7,426
2,285
MMBtu
-
-
Tgal
$(-1,766)
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,523
Cost:
$14,669
$4,459 212,485 $5,064 362 - - - - - - - - - - $4,459
212,485
kWh
$5,064
362
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
06: 3.4153 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER Savings:
$1,294
Cost:
$200
- - - - - - $1,294 293,236 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,294
293,236
Tgal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$449,580
Cost:
$361,369
$9,246 440,503 $23,268 1,660 $38,016 11,697 $1,294 293,236 $283,406 - $18,750 - $75,600 - $9,246
440,503
kWh
$23,268
1,660
kW-months/year
$38,016
11,697
MMBtu
$1,294
293,236
Tgal
$283,406
-
$
$18,750
-
$
$75,600
-
$
TOTAL IMPLEMENTED Savings:
$407,265
Cost:
$324,669
$7,672 365,474 $20,071 1,432 - - - - $285,172 - $18,750 - $75,600 - $7,672
365,474
kWh
$20,071
1,432
kW-months/year
-
-
MMBtu
-
-
Tgal
$285,172
-
$
$18,750
-
$
$75,600
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost