IAC Assessment: UD0574
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0574
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1999
Principal Product Cinder and concrete blocks
NAICS n/a
SIC 3271 - Concrete Block And Brick
Sales $1,000,000-$5,000,000
# of Employees 7
Plant Area (Sq.Ft.) 20,000
Annual Production 1,800,000 Pieces
Production Hrs. Annual 2,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,793 165,592 kWh $0.02
Electricity Demand $19,923 1,416 kW-months/year $14.07
Natural Gas $9,115 1,859 MMBtu $4.90
TOTAL ENERGY COSTS $32,831
RECOMMENDED SAVINGS* $121,995 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,572
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product By-product Production Increase in Production Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product By-product Production Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ $ $ %
01: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$53,280
Cost:
$5,000
- - - - - - - - $53,280 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$53,280
-
$
-
-
$
-
-
%
02: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$44,950
Cost:
$110,000
- - - - $1,750 - - - - - - - $43,200 - -
-
kWh
-
-
kW-months/year
$1,750
-
$
-
-
$
-
-
$
-
-
$
$43,200
-
%
03: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$11,550
Cost:
-
- - - - - - $11,550 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$11,550
-
$
-
-
$
-
-
$
-
-
%
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,572
Cost:
-
- - $5,572 396 - - - - - - - - - - -
-
kWh
$5,572
396
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
05: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$6,643
Cost:
$10,000
$(-910) (-33,705) $(-2,847) (-202) $1,400 - - - - - $9,000 - - - $(-910)
(-33,705)
kWh
$(-2,847)
(-202)
kW-months/year
$1,400
-
$
-
-
$
-
-
$
$9,000
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$121,995
Cost:
$125,000
$(-910) (-33,705) $2,725 194 $3,150 - $11,550 - $53,280 - $9,000 - $43,200 - $(-910)
(-33,705)
kWh
$2,725
194
kW-months/year
$3,150
-
$
$11,550
-
$
$53,280
-
$
$9,000
-
$
$43,200
-
%
TOTAL IMPLEMENTED Savings:
$5,572
Cost:
-
- - $5,572 396 - - - - - - - - - - -
-
kWh
$5,572
396
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product By-product Production Increase in Production Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product By-product Production Increase in Production