IAC logo
IAC Assessment: UD0578
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0578
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1999
Principal Product mustard and horseradish condiments
NAICS n/a
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 70,000
Annual Production 480,000 Pieces
Production Hrs. Annual 4,862
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,824 1,341,735 kWh $0.10
Natural Gas $41,825 8,807 MMBtu $4.75
TOTAL ENERGY COSTS $170,649
RECOMMENDED SAVINGS* $411,362 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $366,410
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ MMBtu $ Tgal $ lb $ $ $ $
01: 4.5150 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$323,997
Cost:
$26,940
- - - - - - - - $65,520 - $258,477 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$65,520
-
$
$258,477
-
$
02: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$26,052
Cost:
-
- - - - - - - - $5,850 - $20,202 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$5,850
-
$
$20,202
-
$
03: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$19,500
Cost:
$8,600
- - - - - - - - $19,500 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$19,500
-
$
-
-
$
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$17,671
Cost:
$3,000
- - $8,147 1,697 $9,524 3,166,504 - - - - - - -
-
kWh
$8,147
1,697
MMBtu
$9,524
3,166,504
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$8,867
Cost:
-
$8,867 71,219 - - - - - - - - - - $8,867
71,219
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$5,242
Cost:
-
- - - - $5,242 3,111,896 - - - - - - -
-
kWh
-
-
MMBtu
$5,242
3,111,896
Tgal
-
-
lb
-
-
$
-
-
$
07: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$3,939
Cost:
$6,750
- - - - $3,939 3,267,491 - - - - - - -
-
kWh
-
-
MMBtu
$3,939
3,267,491
Tgal
-
-
lb
-
-
$
-
-
$
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,734
Cost:
$13,000
$3,734 155,627 - - - - - - - - - - $3,734
155,627
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
09: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,220
Cost:
$230
$1,220 50,703 - - - - - - - - - - $1,220
50,703
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,140
Cost:
-
- - - - - - $2,700 360,000 $(-1,560) - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$2,700
360,000
lb
$(-1,560)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$411,362
Cost:
$58,520
$13,821 277,549 $8,147 1,697 $18,705 9,545,891 $2,700 360,000 $89,310 - $278,679 - $13,821
277,549
kWh
$8,147
1,697
MMBtu
$18,705
9,545,891
Tgal
$2,700
360,000
lb
$89,310
-
$
$278,679
-
$
TOTAL IMPLEMENTED Savings:
$366,410
Cost:
$38,540
- - $8,147 1,697 $14,766 6,278,400 - - $85,020 - $258,477 - -
-
kWh
$8,147
1,697
MMBtu
$14,766
6,278,400
Tgal
-
-
lb
$85,020
-
$
$258,477
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes