IAC logo
IAC Assessment: UD0580
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0580
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1999
Principal Product Welding wire
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 350,000
Annual Production 105,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $798,797 15,994,725 kWh $0.05
Electricity Demand $368,402 32,316 kW-months/year $11.40
Natural Gas $125,534 29,089 MMBtu $4.32
TOTAL ENERGY COSTS $1,292,733
RECOMMENDED SAVINGS* $1,166,011 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,695
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ gal $ gal $ lb $ $ $ $ $ $ $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$862,392
Cost:
$1,300,000
$569,184 10,164,127 $165,528 14,520 $(-608,029) (-141,402) $735,709 74,314 - - - - - - - - - - - - - - - - $569,184
10,164,127
kWh
$165,528
14,520
kW-months/year
$(-608,029)
(-141,402)
MMBtu
$735,709
74,314
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$134,400
Cost:
$400,000
- - - - - - - - - - - - - - - - $134,400 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
$134,400
-
$
-
-
$
-
-
$
-
-
$
03: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$52,000
Cost:
$140,000
- - - - - - - - $35,000 28,350,000 - - - - - - - - $17,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$35,000
28,350,000
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
$17,000
-
$
-
-
$
-
-
$
04: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$39,393
Cost:
$10,000
- - - - - - - - - - - - - - - - $16,800 - - - - - $22,593 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
$16,800
-
$
-
-
$
-
-
$
$22,593
-
$
05: 3.4153 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER Savings:
$27,840
Cost:
$3,500
- - - - - - - - $27,840 18,144,000 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$27,840
18,144,000
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$27,804
Cost:
$11,744
$23,126 412,954 $4,678 410 - - - - - - - - - - - - - - - - - - - - $23,126
412,954
kWh
$4,678
410
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,051
Cost:
$30,337
$14,248 254,396 $4,803 421 - - - - - - - - - - - - - - - - - - - - $14,248
254,396
kWh
$4,803
421
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$1,713
Cost:
$2,500
- - - - - - - - - - - - $492 675 $(-129) - - - - - $1,350 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
gal
$492
675
gal
$(-129)
-
lb
-
-
$
-
-
$
$1,350
-
$
-
-
$
09: 3.8136 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED Savings:
$1,418
Cost:
-
- - - - - - - - - - $(-400) (-5) $1,448 200 - - - - - - $370 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$(-400)
(-5)
gal
$1,448
200
gal
-
-
lb
-
-
$
-
-
$
$370
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,166,011
Cost:
$1,898,081
$606,558 10,831,477 $175,009 15,351 $(-608,029) (-141,402) $735,709 74,314 $62,840 46,494,000 $(-400) (-5) $1,940 875 $(-129) - $151,200 - $17,000 - $1,720 - $22,593 - $606,558
10,831,477
kWh
$175,009
15,351
kW-months/year
$(-608,029)
(-141,402)
MMBtu
$735,709
74,314
MMBtu
$62,840
46,494,000
Tgal
$(-400)
(-5)
gal
$1,940
875
gal
$(-129)
-
lb
$151,200
-
$
$17,000
-
$
$1,720
-
$
$22,593
-
$
TOTAL IMPLEMENTED Savings:
$74,695
Cost:
$45,581
$37,374 667,350 $9,481 831 - - - - $27,840 18,144,000 - - - - - - - - - - - - - - $37,374
667,350
kWh
$9,481
831
kW-months/year
-
-
MMBtu
-
-
MMBtu
$27,840
18,144,000
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ gal $ gal $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product