IAC logo
IAC Assessment: UD0586
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0586
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2000
Principal Product Food products
NAICS n/a
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 190
Plant Area (Sq.Ft.) 100,000
Annual Production 364,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,401 7,073,857 kWh $0.03
Electricity Demand $288,179 15,696 kW-months/year $18.36
Natural Gas $93,182 26,022 MMBtu $3.58
TOTAL ENERGY COSTS $843,307
RECOMMENDED SAVINGS* $676,616 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,837
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product Increase in Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ $ $ Tgal $ $ $ %
01: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$454,896
Cost:
$340,000
- - - - - - $219,024 - - - - - - - $235,872 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$219,024
-
$
-
-
$
-
-
$
-
-
Tgal
$235,872
-
$
-
-
%
02: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$99,635
Cost:
$350,000
- - - - $(-9,967) - $(-12,012) - $148,134 - $(-26,520) - - - - - - - -
-
kWh
-
-
kW-months/year
$(-9,967)
-
$
$(-12,012)
-
$
$148,134
-
$
$(-26,520)
-
$
-
-
Tgal
-
-
$
-
-
%
03: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$96,665
Cost:
$5,000
- - - - - - - - - - - - - - - - $96,665 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
$96,665
-
%
04: 3.4151 MINIMIZE WATER USAGE Savings:
$18,654
Cost:
$298
- - - - - - - - - - - - $18,654 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
$18,654
-
Tgal
-
-
$
-
-
%
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,183
Cost:
-
$1,679 72,978 $3,504 156 - - - - - - - - - - - - - - $1,679
72,978
kWh
$3,504
156
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
%
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,583
Cost:
-
$383 18,171 $1,200 53 - - - - - - - - - - - - - - $383
18,171
kWh
$1,200
53
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$676,616
Cost:
$695,298
$2,062 91,149 $4,704 209 $(-9,967) - $207,012 - $148,134 - $(-26,520) - $18,654 - $235,872 - $96,665 - $2,062
91,149
kWh
$4,704
209
kW-months/year
$(-9,967)
-
$
$207,012
-
$
$148,134
-
$
$(-26,520)
-
$
$18,654
-
Tgal
$235,872
-
$
$96,665
-
%
TOTAL IMPLEMENTED Savings:
$23,837
Cost:
$298
$1,679 72,978 $3,504 156 - - - - - - - - $18,654 - - - - - $1,679
72,978
kWh
$3,504
156
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
$18,654
-
Tgal
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $ $ Tgal $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product Increase in Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product Increase in Production