IAC logo
IAC Assessment: UD0589
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0589
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2000
Principal Product compression molded polymer consumer products
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 75,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 7,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,120 3,614,889 kWh $0.02
Electricity Demand $126,570 9,132 kW-months/year $13.86
Natural Gas $21,037 4,370 MMBtu $4.81
TOTAL ENERGY COSTS $249,027
RECOMMENDED SAVINGS* $321,027 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,957
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$240,319
Cost:
$400,000
$(-3,571) (-169,988) $(-15,310) (-1,092) - - $81,000 450,000 - - $178,200 - - - $(-3,571)
(-169,988)
kWh
$(-15,310)
(-1,092)
kW-months/year
-
-
MMBtu
$81,000
450,000
lb
-
-
$
$178,200
-
$
-
-
$
02: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$35,731
Cost:
-
$1,526 72,685 $31,965 2,280 - - $240 6,000 - - $2,000 - - - $1,526
72,685
kWh
$31,965
2,280
kW-months/year
-
-
MMBtu
$240
6,000
lb
-
-
$
$2,000
-
$
-
-
$
03: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$34,765
Cost:
-
- - - - - - - - $(-60,000) - - - $94,765 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-60,000)
-
$
-
-
$
$94,765
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,192
Cost:
$640
$2,011 95,838 $2,238 160 $943 197 - - - - - - - - $2,011
95,838
kWh
$2,238
160
kW-months/year
$943
197
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,943
Cost:
$6,246
$1,136 54,220 $1,807 129 - - - - - - - - - - $1,136
54,220
kWh
$1,807
129
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,077
Cost:
$4,500
$983 46,893 $1,094 78 - - - - - - - - - - $983
46,893
kWh
$1,094
78
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$321,027
Cost:
$411,386
$2,085 99,648 $21,794 1,555 $943 197 $81,240 456,000 $(-60,000) - $180,200 - $94,765 - $2,085
99,648
kWh
$21,794
1,555
kW-months/year
$943
197
MMBtu
$81,240
456,000
lb
$(-60,000)
-
$
$180,200
-
$
$94,765
-
$
TOTAL IMPLEMENTED Savings:
$39,957
Cost:
$640
$2,011 95,838 $2,238 160 $943 197 - - $(-60,000) - - - $94,765 - $2,011
95,838
kWh
$2,238
160
kW-months/year
$943
197
MMBtu
-
-
lb
$(-60,000)
-
$
-
-
$
$94,765
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product