Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2000 |
Principal Product | gray and ductile iron castings, fabricated metal |
NAICS | n/a |
SIC | 3321 - Gray And Ductile Iron Foundries |
Sales | $10,000,000-$50,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 84,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $845,115 | 22,220,985 | kWh | $0.04 |
Electricity Demand | $91,820 | 30,144 | kW-months/year | $3.05 |
Natural Gas | $139,337 | 34,665 | MMBtu | $4.02 |
TOTAL ENERGY COSTS | $1,076,272 | |||
RECOMMENDED SAVINGS* | $159,172 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,511 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Energy | Personnel Changes | Administrative Changes | Primary Raw Material | Electricity Usage | Natural Gas | Other Energy | Personnel Changes | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $75,117 Cost: - |
- | - | - | - | - | - | - | - | $75,117 | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
$75,117 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $42,268 Cost: $45,000 |
- | - | - | - | $768 | 11 | $34,000 | - | - | - | $7,500 | - |
- - kWh |
- - MMBtu |
$768 11 MMBtu |
$34,000 - $ |
- - $ |
$7,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE |
Savings: $36,834 Cost: $55,945 |
- | - | $(-45,969) | (-11,435) | $82,803 | 9,148 | - | - | - | - | - | - |
- - kWh |
$(-45,969) (-11,435) MMBtu |
$82,803 9,148 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,243 Cost: $6,080 |
- | - | - | - | $3,243 | 450 | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
$3,243 450 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $1,710 Cost: - |
$1,710 | 45,135 | - | - | - | - | - | - | - | - | - | - |
$1,710 45,135 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $159,172 Cost: $107,025 |
$1,710 | 45,135 | $(-45,969) | (-11,435) | $86,814 | 9,609 | $34,000 | - | $75,117 | - | $7,500 | - | $1,710 45,135 kWh |
$(-45,969) (-11,435) MMBtu |
$86,814 9,609 MMBtu |
$34,000 - $ |
$75,117 - $ |
$7,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,511 Cost: $51,080 |
- | - | - | - | $4,011 | 461 | $34,000 | - | - | - | $7,500 | - | - - kWh |
- - MMBtu |
$4,011 461 MMBtu |
$34,000 - $ |
- - $ |
$7,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Energy | Personnel Changes | Administrative Changes | Primary Raw Material | Electricity Usage | Natural Gas | Other Energy | Personnel Changes | Administrative Changes | Primary Raw Material |