IAC logo
IAC Assessment: UD0596
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0596
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2000
Principal Product precision mechanical springs and formed wire components
NAICS n/a
SIC 3495 - Wire Springs
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 47,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 4,750
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,680 1,390,387 kWh $0.04
Electricity Demand $96,526 4,704 kW-months/year $20.52
Natural Gas $2,470 511 MMBtu $4.83
TOTAL ENERGY COSTS $153,676
RECOMMENDED SAVINGS* $54,001 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,421
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$33,230
Cost:
$60,000
$1,254 48,359 $13,051 636 $(-1,075) 219 $20,000 - $1,254
48,359
kWh
$13,051
636
kW-months/year
$(-1,075)
219
MMBtu
$20,000
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,200
Cost:
$27,423
$2,567 125,733 $7,633 372 - - - - $2,567
125,733
kWh
$7,633
372
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,221
Cost:
$1,200
$412 15,826 $1,083 53 $2,726 556 - - $412
15,826
kWh
$1,083
53
kW-months/year
$2,726
556
MMBtu
-
-
$
04: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$3,651
Cost:
$1,298
$647 24,912 $3,004 146 - - - - $647
24,912
kWh
$3,004
146
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,699
Cost:
$3,072
$294 11,430 $2,405 352 - - - - $294
11,430
kWh
$2,405
352
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$54,001
Cost:
$92,993
$5,174 226,260 $27,176 1,559 $1,651 775 $20,000 - $5,174
226,260
kWh
$27,176
1,559
kW-months/year
$1,651
775
MMBtu
$20,000
-
$
TOTAL IMPLEMENTED Savings:
$14,421
Cost:
$28,623
$2,979 141,559 $8,716 425 $2,726 556 - - $2,979
141,559
kWh
$8,716
425
kW-months/year
$2,726
556
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes