IAC logo
IAC Assessment: UD0600
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0600
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2000
Principal Product plastic injection molded food containers
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 330
Plant Area (Sq.Ft.) 160,000
Annual Production 101,600 Pounds
Production Hrs. Annual 8,400
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $974,451 29,156,507 kWh $0.03
Electricity Demand $156,316 52,285 kW-months/year $2.99
LPG $12,766 3,929 MMBtu $3.25
TOTAL ENERGY COSTS $1,157,173
RECOMMENDED SAVINGS* $95,292 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,100
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
01: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$74,100
Cost:
$16,000
- - - - - - - - - - $74,100 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$74,100
-
$
02: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$11,664
Cost:
$4,200
- - - - $11,664 4,800 - - - - - - -
-
kWh
-
-
kW-months/year
$11,664
4,800
gal
-
-
lb
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,810
Cost:
-
- - $4,510 126 - - - - $(-700) - - - -
-
kWh
$4,510
126
kW-months/year
-
-
gal
-
-
lb
$(-700)
-
$
-
-
$
04: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) Savings:
$3,780
Cost:
$1,200
- - - - - - $3,780 21,840 - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$3,780
21,840
lb
-
-
$
-
-
$
05: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,938
Cost:
$7,000
$1,228 39,566 $710 20 - - - - - - - - $1,228
39,566
kWh
$710
20
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$95,292
Cost:
$28,400
$1,228 39,566 $5,220 146 $11,664 4,800 $3,780 21,840 $(-700) - $74,100 - $1,228
39,566
kWh
$5,220
146
kW-months/year
$11,664
4,800
gal
$3,780
21,840
lb
$(-700)
-
$
$74,100
-
$
TOTAL IMPLEMENTED Savings:
$74,100
Cost:
$16,000
- - - - - - - - - - $74,100 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$74,100
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes