IAC logo
IAC Assessment: UD0601
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0601
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2000
Principal Product Aluminum sand and permanent mold castings
NAICS n/a
SIC 3365 - Aluminum Foundries
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 98,700
Annual Production 4,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,956 8,173,212 kWh $0.02
Electricity Demand $238,734 17,016 kW-months/year $14.03
LPG $350,496 88,363 MMBtu $3.97
TOTAL ENERGY COSTS $760,186
RECOMMENDED SAVINGS* $269,256 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $138,600
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$138,600
Cost:
-
- - - - - - - - $138,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$138,600
-
$
-
-
$
02: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$62,400
Cost:
$100,000
- - - - - - - - $62,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$62,400
-
$
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$55,632
Cost:
$160,000
$31,705 1,510,258 $49,498 3,528 $(-25,571) (-6,441) - - - - - - $31,705
1,510,258
kWh
$49,498
3,528
kW-months/year
$(-25,571)
(-6,441)
MMBtu
-
-
lb
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$6,102
Cost:
$6,000
- - - - - - $162 7,200 $(-1,560) - $7,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$162
7,200
lb
$(-1,560)
-
$
$7,500
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,846
Cost:
$6,241
$550 31,946 $1,296 92 - - - - - - - - $550
31,946
kWh
$1,296
92
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7145 INSTALL SKYLIGHTS Savings:
$4,676
Cost:
$6,300
$1,342 63,892 $3,334 356 - - - - - - - - $1,342
63,892
kWh
$3,334
356
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$269,256
Cost:
$278,541
$33,597 1,606,096 $54,128 3,976 $(-25,571) (-6,441) $162 7,200 $199,440 - $7,500 - $33,597
1,606,096
kWh
$54,128
3,976
kW-months/year
$(-25,571)
(-6,441)
MMBtu
$162
7,200
lb
$199,440
-
$
$7,500
-
$
TOTAL IMPLEMENTED Savings:
$138,600
Cost:
-
- - - - - - - - $138,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$138,600
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes