Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2000 |
Principal Product | Polymer pellets for injection molding |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 35,000,000 Pounds |
Production Hrs. Annual | 6,864 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $338,898 | 9,685,522 | kWh | $0.03 |
Electricity Demand | $235,984 | 23,040 | kW-months/year | $10.24 |
LPG | $57,130 | 11,747 | MMBtu | $4.86 |
TOTAL ENERGY COSTS | $691,226 | |||
RECOMMENDED SAVINGS* | $759,606 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $643,500 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.625 DEVELOP STANDARD OPERATING PROCEDURES |
Savings: $643,500 Cost: $150,000 |
- | - | - | - | - | - | $643,500 | - |
- - kWh |
- - kW-months/year |
- - lb |
$643,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $91,844 Cost: - |
- | - | - | - | $91,844 | - | - | - |
- - kWh |
- - kW-months/year |
$91,844 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,455 Cost: $31,020 |
$10,306 | 294,549 | $5,149 | 516 | - | - | - | - |
$10,306 294,549 kWh |
$5,149 516 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $8,807 Cost: $7,600 |
- | - | $4,032 | 420 | - | - | $4,775 | - |
- - kWh |
$4,032 420 kW-months/year |
- - lb |
$4,775 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $759,606 Cost: $188,620 |
$10,306 | 294,549 | $9,181 | 936 | $91,844 | - | $648,275 | - | $10,306 294,549 kWh |
$9,181 936 kW-months/year |
$91,844 - lb |
$648,275 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $643,500 Cost: $150,000 |
- | - | - | - | - | - | $643,500 | - | - - kWh |
- - kW-months/year |
- - lb |
$643,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |