Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2000
Principal Product Commercial offset printing
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 191
Plant Area (Sq.Ft.) 110,000
Annual Production 70,000,000 Tons
Production Hrs. Annual 8,736
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $625,342 12,265,241 kWh $0.05
Electricity Demand $193,401 29,009 kW-months/year $6.67
Natural Gas $219,874 52,351 MMBtu $4.20
TOTAL ENERGY COSTS $1,067,819
RECOMMENDED SAVINGS* $460,130 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,115
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 3.2176 INCREASE USE OF AUTOMATION Savings:
$319,840
Cost:
$25,000
- - - - $319,840 - - - -
-
kWh
-
-
kW-months/year
$319,840
-
$
-
-
$
02: 2.2693 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION Savings:
$83,745
Cost:
$260,000
$69,503 1,363,130 $14,742 2,106 - - $(-500) - $69,503
1,363,130
kWh
$14,742
2,106
kW-months/year
-
-
$
$(-500)
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$48,430
Cost:
$26,800
$38,791 760,844 $9,639 1,224 - - - - $38,791
760,844
kWh
$9,639
1,224
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,115
Cost:
$12,979
$6,693 131,301 $1,422 226 - - - - $6,693
131,301
kWh
$1,422
226
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$460,130
Cost:
$324,779
$114,987 2,255,275 $25,803 3,556 $319,840 - $(-500) - $114,987
2,255,275
kWh
$25,803
3,556
kW-months/year
$319,840
-
$
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$8,115
Cost:
$12,979
$6,693 131,301 $1,422 226 - - - - $6,693
131,301
kWh
$1,422
226
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost