IAC Assessment: UD0612
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0612
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2001
Principal Product Automation Equipments
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 60,000
Annual Production 30 Pieces
Production Hrs. Annual 2,475
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,635 620,640 kWh $0.03
Electricity Demand $35,794 2,544 kW-months/year $14.07
Natural Gas $6,839 1,102 MMBtu $6.21
TOTAL ENERGY COSTS $62,616
RECOMMENDED SAVINGS* $6,759 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,646
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,331
Cost:
$200
$676 24,131 $1,655 118 - - - - - - - - $676
24,131
kWh
$1,655
118
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,820
Cost:
$4,275
$543 19,409 $1,300 92 - - - - - - $(-23) - $543
19,409
kWh
$1,300
92
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$(-23)
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$782
Cost:
$800
$80 936 - - $702 113 - - - - - - $80
936
kWh
-
-
kW-months/year
$702
113
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$765
Cost:
$3,000
- - - - - - - - $765 34,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$765
34,000
lb
-
-
$
05: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$533
Cost:
$1,200
- - - - - - $880 60 - - $(-347) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$880
60
gal
-
-
lb
$(-347)
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$528
Cost:
$600
- - - - $528 85 - - - - - - -
-
kWh
-
-
kW-months/year
$528
85
MMBtu
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$6,759
Cost:
$10,075
$1,299 44,476 $2,955 210 $1,230 198 $880 60 $765 34,000 $(-370) - $1,299
44,476
kWh
$2,955
210
kW-months/year
$1,230
198
MMBtu
$880
60
gal
$765
34,000
lb
$(-370)
-
$
TOTAL IMPLEMENTED Savings:
$3,646
Cost:
$2,200
$756 25,067 $1,655 118 $702 113 $880 60 - - $(-347) - $756
25,067
kWh
$1,655
118
kW-months/year
$702
113
MMBtu
$880
60
gal
-
-
lb
$(-347)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes