IAC Assessment: UD0616
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2001
Principal Product Motor Vehicle Parts
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 60,000
Annual Production 16,000,000 Pieces
Production Hrs. Annual 2,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,421 1,562,120 kWh $0.03
Electricity Demand $69,224 4,920 kW-months/year $14.07
Natural Gas $12,702 2,086 MMBtu $6.09
TOTAL ENERGY COSTS $125,347
RECOMMENDED SAVINGS* $331,602 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
01: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$252,000
Cost:
$75,000
- - - - - - - - - - $252,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$252,000
-
$
-
-
$
-
-
$
02: 4.125 Savings:
$52,440
Cost:
$1,200
- - - - - - - - - - $35,280 - - - $17,160 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$35,280
-
$
-
-
$
$17,160
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,581
Cost:
$12,000
$2,021 72,171 $6,247 444 $2,313 379 - - - - - - - - - - $2,021
72,171
kWh
$6,247
444
kW-months/year
$2,313
379
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$12,893
Cost:
$3,200
- - - - - - $3,983 2,921 - - - - $8,910 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,983
2,921
gal
-
-
lb
-
-
$
$8,910
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,612
Cost:
$3,000
- - - - - - - - $1,612 5,400 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,612
5,400
lb
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$944
Cost:
$2,412
$269 9,600 $675 48 - - - - - - - - - - - - $269
9,600
kWh
$675
48
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$637
Cost:
-
$181 6,480 $456 32 - - - - - - - - - - - - $181
6,480
kWh
$456
32
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$495
Cost:
$1,200
$190 2,641 - - $305 50 - - - - - - - - - - $190
2,641
kWh
-
-
kW-months/year
$305
50
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$331,602
Cost:
$98,012
$2,661 90,892 $7,378 524 $2,618 429 $3,983 2,921 $1,612 5,400 $287,280 - $8,910 - $17,160 - $2,661
90,892
kWh
$7,378
524
kW-months/year
$2,618
429
MMBtu
$3,983
2,921
gal
$1,612
5,400
lb
$287,280
-
$
$8,910
-
$
$17,160
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product