IAC Assessment: UD0618
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0618
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2001
Principal Product Metal burial vaults and steel coil processing
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 250,000
Annual Production 100,000 Tons
Production Hrs. Annual 3,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,550 3,769,222 kWh $0.05
Electricity Demand $36,978 10,032 kW-months/year $3.69
Natural Gas $346,322 54,927 MMBtu $6.31
TOTAL ENERGY COSTS $596,024
RECOMMENDED SAVINGS* $194,430 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,512
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 3.2176 INCREASE USE OF AUTOMATION Savings:
$124,000
Cost:
$240,000
- - - - - - - - - - $124,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$124,000
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$26,445
Cost:
$5,700
- - - - $26,445 4,191 - - - - - - - - -
-
kWh
-
-
kW-months/year
$26,445
4,191
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,036
Cost:
$25,000
- - - - - - $4,812 899,964 - - $4,224 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,812
899,964
gal
-
-
lb
$4,224
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$8,474
Cost:
$6,280
- - - - $8,474 1,343 - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,474
1,343
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,038
Cost:
$1,450
$6,528 136,000 $1,510 408 - - - - - - - - - - $6,528
136,000
kWh
$1,510
408
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,458
Cost:
$5,700
- - - - $7,458 1,182 - - - - - - - - -
-
kWh
-
-
kW-months/year
$7,458
1,182
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,522
Cost:
$3,000
- - - - - - - - $4,522 75,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$4,522
75,000
lb
-
-
$
-
-
$
08: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$3,394
Cost:
-
$2,430 50,626 $964 260 - - - - - - - - - - $2,430
50,626
kWh
$964
260
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
09: 2.2421 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER Savings:
$1,779
Cost:
$5,000
- - - - $1,779 282 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,779
282
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
10: 3.4155 METER WASTE WATER Savings:
$1,284
Cost:
$500
- - - - - - - - - - - - $1,284 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$1,284
-
$
TOTAL RECOMMENDED Savings:
$194,430
Cost:
$292,630
$8,958 186,626 $2,474 668 $44,156 6,998 $4,812 899,964 $4,522 75,000 $128,224 - $1,284 - $8,958
186,626
kWh
$2,474
668
kW-months/year
$44,156
6,998
MMBtu
$4,812
899,964
gal
$4,522
75,000
lb
$128,224
-
$
$1,284
-
$
TOTAL IMPLEMENTED Savings:
$16,512
Cost:
$7,730
$6,528 136,000 $1,510 408 $8,474 1,343 - - - - - - - - $6,528
136,000
kWh
$1,510
408
kW-months/year
$8,474
1,343
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes