IAC logo
IAC Assessment: UD0624
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0624
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2001
Principal Product Solenoids
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 280
Plant Area (Sq.Ft.) 104,000
Annual Production 10,000 Pieces
Production Hrs. Annual 4,125
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,300 2,583,300 kWh $0.02
Electricity Demand $110,104 7,944 kW-months/year $13.86
Natural Gas $14,956 1,778 MMBtu $8.41
TOTAL ENERGY COSTS $207,831
RECOMMENDED SAVINGS* $42,049 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,955
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ Tgal $ gal $ $
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$29,813
Cost:
$10,710
$66 2,975 $118 8 $30,129 6,075,320 $(-500) - - - $66
2,975
kWh
$118
8
kW-months/year
$30,129
6,075,320
Tgal
$(-500)
-
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,975
Cost:
$13,704
$3,581 162,750 $7,394 528 - - - - - - $3,581
162,750
kWh
$7,394
528
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$980
Cost:
$414
$308 14,000 $672 48 - - - - - - $308
14,000
kWh
$672
48
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$281
Cost:
$500
- - - - - - - - $281 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$281
-
$
TOTAL RECOMMENDED Savings:
$42,049
Cost:
$25,328
$3,955 179,725 $8,184 584 $30,129 6,075,320 $(-500) - $281 - $3,955
179,725
kWh
$8,184
584
kW-months/year
$30,129
6,075,320
Tgal
$(-500)
-
gal
$281
-
$
TOTAL IMPLEMENTED Savings:
$11,955
Cost:
$14,118
$3,889 176,750 $8,066 576 - - - - - - $3,889
176,750
kWh
$8,066
576
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ $
Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Administrative Changes