Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2001 |
Principal Product | Pressure senstive flexographic printing on labels, tapes and |
NAICS | n/a |
SIC | 2672 - Paper Coated And Laminated, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 35,000 |
Annual Production | 4,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $34,878 | 1,201,200 | kWh | $0.03 |
Electricity Demand | $43,040 | 2,952 | kW-months/year | $14.58 |
Natural Gas | $10,910 | 1,264 | MMBtu | $8.63 |
TOTAL ENERGY COSTS | $98,743 | |||
RECOMMENDED SAVINGS* | $71,499 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,635 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $49,350 Cost: $4,680 |
- | - | - | - | - | - | $49,350 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$49,350 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $6,653 Cost: - |
$1,404 | 45,000 | $5,249 | 360 | - | - | - | - |
$1,404 45,000 kWh |
$5,249 360 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $3,326 Cost: $1,000 |
$702 | 22,500 | $2,624 | 180 | - | - | - | - |
$702 22,500 kWh |
$2,624 180 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6122 ADJUST VENTS TO MINIMIZE ENERGY USE |
Savings: $2,451 Cost: $112 |
$232 | 5,158 | $87 | 6 | $2,132 | 247 | - | - |
$232 5,158 kWh |
$87 6 kW-months/year |
$2,132 247 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $2,173 Cost: $364 |
$1,123 | 36,000 | $1,050 | 72 | - | - | - | - |
$1,123 36,000 kWh |
$1,050 72 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $2,158 Cost: $1,050 |
- | - | - | - | $2,158 | 250 | - | - |
- - kWh |
- - kW-months/year |
$2,158 250 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,847 Cost: $42 |
$955 | 30,600 | $892 | 61 | - | - | - | - |
$955 30,600 kWh |
$892 61 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,587 Cost: $423 |
$187 | 6,000 | $1,400 | 96 | - | - | - | - |
$187 6,000 kWh |
$1,400 96 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS |
Savings: $860 Cost: $250 |
$265 | 8,500 | $595 | 41 | - | - | - | - |
$265 8,500 kWh |
$595 41 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $580 Cost: $2,526 |
$300 | 9,600 | $280 | 19 | - | - | - | - |
$300 9,600 kWh |
$280 19 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $514 Cost: - |
$266 | 8,520 | $248 | 17 | - | - | - | - |
$266 8,520 kWh |
$248 17 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $71,499 Cost: $10,447 |
$5,434 | 171,878 | $12,425 | 852 | $4,290 | 497 | $49,350 | - | $5,434 171,878 kWh |
$12,425 852 kW-months/year |
$4,290 497 MMBtu |
$49,350 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,635 Cost: $5,767 |
$5,168 | 163,358 | $12,177 | 835 | $4,290 | 497 | - | - | $5,168 163,358 kWh |
$12,177 835 kW-months/year |
$4,290 497 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |