IAC Assessment: UD0642
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0642
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2002
Principal Product Fluid piping system
NAICS n/a
SIC 3568 - Power Transmission Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 57,000
Annual Production 67,500,000 Pieces
Production Hrs. Annual 7,488
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,547 1,477,345 kWh $0.02
Electricity Demand $51,371 3,288 kW-months/year $15.62
Natural Gas $22,627 2,447 MMBtu $9.25
TOTAL ENERGY COSTS $104,547
RECOMMENDED SAVINGS* $56,238 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,438
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$39,312
Cost:
-
- - - - - - $39,312 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$39,312
-
$
-
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$8,274
Cost:
$39,600
- - $8,274 528 - - - - - - -
-
kWh
$8,274
528
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,876
Cost:
$5,000
- - - - $450 50,000 - - $2,426 - -
-
kWh
-
-
kW-months/year
$450
50,000
lb
-
-
$
$2,426
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,364
Cost:
$7,000
$1,048 52,416 $1,316 84 - - - - - - $1,048
52,416
kWh
$1,316
84
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,027
Cost:
$1,450
$899 44,928 $1,128 72 - - - - - - $899
44,928
kWh
$1,128
72
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,047
Cost:
$400
$464 23,213 $583 37 - - - - - - $464
23,213
kWh
$583
37
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$338
Cost:
$800
$150 7,488 $188 12 - - - - - - $150
7,488
kWh
$188
12
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$56,238
Cost:
$54,250
$2,561 128,045 $11,489 733 $450 50,000 $39,312 - $2,426 - $2,561
128,045
kWh
$11,489
733
kW-months/year
$450
50,000
lb
$39,312
-
$
$2,426
-
$
TOTAL IMPLEMENTED Savings:
$5,438
Cost:
$8,850
$2,411 120,557 $3,027 193 - - - - - - $2,411
120,557
kWh
$3,027
193
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes