Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2002 |
Principal Product | Calcium carbide |
NAICS | n/a |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 70,000 Tons |
Production Hrs. Annual | 8,400 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $4,309,202 | 273,662,645 | kWh | $0.02 |
Electricity Demand | $3,385,802 | 513,984 | kW-months/year | $6.59 |
Natural Gas | $77,425 | 12,908 | MMBtu | $6.00 |
TOTAL ENERGY COSTS | $8,034,780 | |||
RECOMMENDED SAVINGS* | $115,378 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Electricity Usage | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $32,894 Cost: $90,000 |
- | - | $32,894 | 5,482 | - | - |
- - kWh |
$32,894 5,482 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1224 REPLACE BOILER |
Savings: $24,688 Cost: $93,993 |
- | - | $24,040 | 3,005 | $648 | 418,188 |
- - kWh |
$24,040 3,005 MMBtu |
$648 418,188 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $18,168 Cost: - |
- | - | $18,168 | 3,028 | - | - |
- - kWh |
$18,168 3,028 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES |
Savings: $11,525 Cost: - |
$11,525 | 411,600 | - | - | - | - |
$11,525 411,600 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,904 Cost: $25,000 |
$7,904 | 282,282 | - | - | - | - |
$7,904 282,282 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $7,223 Cost: $268 |
$7,223 | 257,954 | - | - | - | - |
$7,223 257,954 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $4,989 Cost: $11,500 |
$4,989 | 178,164 | - | - | - | - |
$4,989 178,164 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,481 Cost: $1,000 |
$4,481 | 160,035 | - | - | - | - |
$4,481 160,035 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES |
Savings: $1,882 Cost: $1,000 |
$1,882 | 67,200 | - | - | - | - |
$1,882 67,200 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $1,370 Cost: $825 |
$1,370 | 32,000 | - | - | - | - |
$1,370 32,000 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $254 Cost: $300 |
$254 | 9,072 | - | - | - | - |
$254 9,072 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $115,378 Cost: $223,886 |
$39,628 | 1,398,307 | $75,102 | 11,515 | $648 | 418,188 | $39,628 1,398,307 kWh |
$75,102 11,515 MMBtu |
$648 418,188 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||