IAC logo
IAC Assessment: UD0644
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0644
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2002
Principal Product Photoreceptors for laser printers and copiers
NAICS n/a
SIC 3861 - Photographic Equipment And Supplies
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 50,000
Annual Production 22,000,000 Pieces
Production Hrs. Annual 8,568
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,278 4,682,125 kWh $0.02
Electricity Demand $153,142 8,316 kW-months/year $18.42
Natural Gas $22,200 2,315 MMBtu $9.59
TOTAL ENERGY COSTS $332,385
RECOMMENDED SAVINGS* $507,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,073
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$462,150
Cost:
$500
- - - - - - $446,544 - $15,606 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$446,544
-
$
$15,606
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$18,360
Cost:
-
- - - - - - - - - - $18,360 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$18,360
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,612
Cost:
-
- - - - - - - - - - $12,612 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$12,612
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,397
Cost:
$13,222
$2,516 139,769 $3,881 228 - - - - - - - - $2,516
139,769
kWh
$3,881
228
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,764
Cost:
$2,775
$1,122 62,362 $1,642 194 - - - - - - - - $1,122
62,362
kWh
$1,642
194
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,953
Cost:
$131
$542 30,090 $2,411 142 - - - - - - - - $542
30,090
kWh
$2,411
142
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,285
Cost:
-
- - - - $1,285 134 - - - - - - -
-
kWh
-
-
kW-months/year
$1,285
134
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$478
Cost:
$500
$274 8,568 $204 12 - - - - - - - - $274
8,568
kWh
$204
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$475
Cost:
$1,348
$87 4,845 $388 23 - - - - - - - - $87
4,845
kWh
$388
23
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$507,474
Cost:
$18,476
$4,541 245,634 $8,526 599 $1,285 134 $446,544 - $15,606 - $30,972 - $4,541
245,634
kWh
$8,526
599
kW-months/year
$1,285
134
MMBtu
$446,544
-
$
$15,606
-
$
$30,972
-
$
TOTAL IMPLEMENTED Savings:
$23,073
Cost:
$1,479
$629 34,935 $2,799 165 $1,285 134 - - - - $18,360 - $629
34,935
kWh
$2,799
165
kW-months/year
$1,285
134
MMBtu
-
-
$
-
-
$
$18,360
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost