IAC logo
IAC Assessment: UD0657
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0657
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2002
Principal Product Plastics products
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 320,000
Annual Production 8,000,000 Pounds
Production Hrs. Annual 6,732
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $749,553 25,355,142 kWh $0.03
Electricity Demand $403,606 50,856 kW-months/year $7.94
Natural Gas $194,691 20,928 MMBtu $9.30
TOTAL ENERGY COSTS $1,380,929
RECOMMENDED SAVINGS* $1,820,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,604,470
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$1,600,000
Cost:
$339,333
- - - - - - $1,600,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,600,000
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$186,552
Cost:
$719,845
$109,561 4,213,868 $76,991 11,580 - - - - $109,561
4,213,868
kWh
$76,991
11,580
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$25,129
Cost:
$10,500
- - - - $25,129 2,702 - - -
-
kWh
-
-
kW-months/year
$25,129
2,702
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,470
Cost:
-
$2,625 100,980 $1,845 180 - - - - $2,625
100,980
kWh
$1,845
180
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,040
Cost:
$9,089
$1,785 68,666 $1,255 122 - - - - $1,785
68,666
kWh
$1,255
122
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$894
Cost:
$1,000
$525 18,360 $369 36 - - - - $525
18,360
kWh
$369
36
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$805
Cost:
$97
$473 18,176 $332 32 - - - - $473
18,176
kWh
$332
32
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,820,890
Cost:
$1,079,864
$114,969 4,420,050 $80,792 11,950 $25,129 2,702 $1,600,000 - $114,969
4,420,050
kWh
$80,792
11,950
kW-months/year
$25,129
2,702
MMBtu
$1,600,000
-
$
TOTAL IMPLEMENTED Savings:
$1,604,470
Cost:
$339,333
$2,625 100,980 $1,845 180 - - $1,600,000 - $2,625
100,980
kWh
$1,845
180
kW-months/year
-
-
MMBtu
$1,600,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes