IAC Assessment: UD0658
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0658
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2002
Principal Product automotive stampings
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 112
Plant Area (Sq.Ft.) 144,000
Annual Production 16,000,000 Pounds
Production Hrs. Annual 6,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,284 4,829,857 kWh $0.03
Electricity Demand $99,522 11,916 kW-months/year $8.35
Natural Gas $36,764 5,167 MMBtu $7.12
TOTAL ENERGY COSTS $329,650
RECOMMENDED SAVINGS* $1,005,204 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $990,180
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Increase in Production Electricity Usage Electricity Demand Natural Gas Water Consumption Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ %
01: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$962,280
Cost:
$448,000
- - - - - - - - $962,280 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$962,280
-
%
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$20,837
Cost:
$16,100
- - - - - - $20,837 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,837
-
Tgal
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,063
Cost:
$8,000
$4,056 156,000 $3,007 288 - - - - - - $4,056
156,000
kWh
$3,007
288
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
%
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,863
Cost:
$1,050
$2,355 208,366 $3,508 336 - - - - - - $2,355
208,366
kWh
$3,508
336
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
%
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,586
Cost:
$7,938
- - - - $4,586 645 - - - - -
-
kWh
-
-
kW-months/year
$4,586
645
MMBtu
-
-
Tgal
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,826
Cost:
$8,905
$2,197 84,500 $1,629 156 - - - - - - $2,197
84,500
kWh
$1,629
156
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
%
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$749
Cost:
-
$749 28,800 - - - - - - - - $749
28,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
%
TOTAL RECOMMENDED Savings:
$1,005,204
Cost:
$489,993
$9,357 477,666 $8,144 780 $4,586 645 $20,837 - $962,280 - $9,357
477,666
kWh
$8,144
780
kW-months/year
$4,586
645
MMBtu
$20,837
-
Tgal
$962,280
-
%
TOTAL IMPLEMENTED Savings:
$990,180
Cost:
$472,100
$4,056 156,000 $3,007 288 - - $20,837 - $962,280 - $4,056
156,000
kWh
$3,007
288
kW-months/year
-
-
MMBtu
$20,837
-
Tgal
$962,280
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ %
Electricity Usage Electricity Demand Natural Gas Water Consumption Increase in Production Electricity Usage Electricity Demand Natural Gas Water Consumption Increase in Production