Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2002
Principal Product Injection molded parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 60,000
Annual Production 1,800,000 Pounds
Production Hrs. Annual 5,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $187,824 4,774,200 kWh $0.04
Electricity Demand $96,758 10,464 kW-months/year $9.25
Natural Gas $179,432 20,474 MMBtu $8.76
TOTAL ENERGY COSTS $483,545
RECOMMENDED SAVINGS* $161,233 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $113,222
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$103,190
Cost:
$31,120
- - - - - - - - $103,190 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$103,190
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,109
Cost:
$68,300
$11,897 283,267 $5,212 566 - - - - - - $11,897
283,267
kWh
$5,212
566
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,958
Cost:
$28,264
$7,558 179,955 $3,400 370 - - - - - - $7,558
179,955
kWh
$3,400
370
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,878
Cost:
$3,000
- - - - - - $5,878 671 - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,878
671
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,400
Cost:
$6,750
- - - - $5,400 - - - - - -
-
kWh
-
-
kW-months/year
$5,400
-
$
-
-
MMBtu
-
-
$
06: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$5,040
Cost:
$1,300
$5,040 120,000 - - - - - - - - $5,040
120,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,633
Cost:
-
$1,584 37,720 $1,049 114 - - - - - - $1,584
37,720
kWh
$1,049
114
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,464
Cost:
$1,000
$1,481 35,272 $983 107 - - - - - - $1,481
35,272
kWh
$983
107
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,424
Cost:
$6,000
$847 20,160 $552 180 - - $1,025 117 - - $847
20,160
kWh
$552
180
kW-months/year
-
-
$
$1,025
117
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,776
Cost:
$120
$1,235 29,400 $541 59 - - - - - - $1,235
29,400
kWh
$541
59
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,450
Cost:
$1,985
$1,008 24,000 $442 48 - - - - - - $1,008
24,000
kWh
$442
48
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,196
Cost:
$519
$832 19,800 $364 40 - - - - - - $832
19,800
kWh
$364
40
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$906
Cost:
$1,785
$630 15,000 $276 30 - - - - - - $630
15,000
kWh
$276
30
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
14: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$417
Cost:
$168
$273 6,500 $144 16 - - - - - - $273
6,500
kWh
$144
16
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
15: 2.7122 DISCONNECT BALLASTS Savings:
$392
Cost:
$35
$271 6,540 $121 13 - - - - - - $271
6,540
kWh
$121
13
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$161,233
Cost:
$150,346
$32,656 777,614 $13,084 1,543 $5,400 - $6,903 788 $103,190 - $32,656
777,614
kWh
$13,084
1,543
kW-months/year
$5,400
-
$
$6,903
788
MMBtu
$103,190
-
$
TOTAL IMPLEMENTED Savings:
$113,222
Cost:
$39,025
$2,987 71,212 $1,645 179 $5,400 - - - $103,190 - $2,987
71,212
kWh
$1,645
179
kW-months/year
$5,400
-
$
-
-
MMBtu
$103,190
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $