IAC logo
IAC Assessment: UD0665
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0665
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2003
Principal Product Aluminum Castings
NAICS 331524 - Aluminum Foundries (except Die-Casting)
SIC 3365 - Aluminum Foundries
Sales $10,000,000-$50,000,000
# of Employees 204
Plant Area (Sq.Ft.) 67,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,823 8,134,333 kWh $0.03
Electricity Demand $186,069 15,060 kW-months/year $12.36
Natural Gas $257,124 354,584 MMBtu $0.73
TOTAL ENERGY COSTS $653,016
RECOMMENDED SAVINGS* $488,641 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,932
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 4.453 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION Savings:
$380,000
Cost:
$38,587
- - - - - - $380,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$380,000
-
%
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$74,995
Cost:
$40,000
- - - - $74,995 10,416 - - -
-
kWh
-
-
kW-months/year
$74,995
10,416
MMBtu
-
-
%
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$14,021
Cost:
$1,545
$5,980 227,378 $4,794 31 $3,247 451 - - $5,980
227,378
kWh
$4,794
31
kW-months/year
$3,247
451
MMBtu
-
-
%
04: 2.2514 COVER OPEN TANKS Savings:
$7,200
Cost:
$12,000
- - - - $7,200 1,000 - - -
-
kWh
-
-
kW-months/year
$7,200
1,000
MMBtu
-
-
%
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,325
Cost:
-
$4,325 164,400 - - - - - - $4,325
164,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,561
Cost:
$8,112
$1,947 74,880 $1,614 10 - - - - $1,947
74,880
kWh
$1,614
10
kW-months/year
-
-
MMBtu
-
-
%
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,363
Cost:
$6,762
$1,292 49,680 $1,071 7 - - - - $1,292
49,680
kWh
$1,071
7
kW-months/year
-
-
MMBtu
-
-
%
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,130
Cost:
$1,000
$665 25,200 $465 3 - - - - $665
25,200
kWh
$465
3
kW-months/year
-
-
MMBtu
-
-
%
09: 2.7122 DISCONNECT BALLASTS Savings:
$790
Cost:
$45
$432 16,632 $358 2 - - - - $432
16,632
kWh
$358
2
kW-months/year
-
-
MMBtu
-
-
%
10: 2.2514 COVER OPEN TANKS Savings:
$256
Cost:
$400
- - - - $256 36 - - -
-
kWh
-
-
kW-months/year
$256
36
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$488,641
Cost:
$108,451
$14,641 558,170 $8,302 53 $85,698 11,903 $380,000 - $14,641
558,170
kWh
$8,302
53
kW-months/year
$85,698
11,903
MMBtu
$380,000
-
%
TOTAL IMPLEMENTED Savings:
$8,932
Cost:
$8,557
$6,704 255,912 $1,972 12 $256 36 - - $6,704
255,912
kWh
$1,972
12
kW-months/year
$256
36
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production